Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-04668
StatusFinaled
Name LM CONSTRUCTION CO LLC
Site Address 8485 S FEDERAL WAY
Project NameTeffco Warehouse North Half
Customer Number 
ePlanReviewYes
Description
(TEFFCO WAREHOUSE – NORTH HALF) Permit for the first time build-out of a warehouse space in the north half of a new warehouse building. North warehouse will be used for storage of Teff Flour; no processing operations will occur in this portion of the building. Work to include: new door in existing demising wall, egress lighting and exit signs, marked aisles through storage area, grain and storage containers. The building Shell was built under BLD18-00596 and site work, envelope and exterior lighting were approved with the shell permit. The 2,950 sq ft Teffco Office was permitted under BLD18-01401 and included the tenant demising wall through the center of the building and plumbing fixtures for the north and south warehouse space. The south warehouse was permitted under BLD18-03233. Utilizes ANSI/ASHREA 90.1. A separate racking permit is required if racks are installed over 8 feet in height or for high-piled combustible storage over 6 ft. This building is fire sprinklered in accordance with NFPA 13 with 60 ft yards for unlimited area. Any alterations or modifications to the buildings Fire Sprinkler WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/4/20202/6/20202/6/2020APASS
DetailsJim Storey
Gareth will be the onsite contact Phone #: ###-#### Inspection requested via web by Gwynne Engelmann
FIRE-Final Inspection2/4/20202/6/20202/6/2020APASS
DetailsJim Page
Previously noted items have been corrected, no fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.

Gareth will be the onsite contact Phone #: ###-#### Inspection requested via web by Gwynne Engelmann
BLD-Final2/3/20202/4/20202/4/2020ACANC
DetailsJim Storey
Gareth is the onsite contact. Phone #: ###-#### >> Inspection requested via web by Gwynne Engelmann Inspection cancelled from web by: Gwynne Engelmann
FIRE-Final Inspection2/4/20202/4/20202/4/2020PFAIL
DetailsTroy Cobbley
No city approved plans or small documents on site. Per the scope egress paths need to be marked through Storage areas. No inspection performed.

Onsite contact will be Gareth. Phone #: ###-#### Inspection requested via web by Gwynne Engelmann