BLD-Blower Door Test Results | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | DONE |
Tell Riley
|
|
|
2.71 ACH 50
|
BLD-Final | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Tell Riley
|
|
|
We''ve completed the door blast and relocated the carbon monoxide detector. Thanks, Phone #: ###-#### Inspection requested via web by Peter Harris//corrections made final completed//
|
DOC - Permit Finaled | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Tell Riley
|
|
|
corrections made final complete
|
BLD-Final | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | NR |
Tell Riley
|
|
|
House will be open. Cleaner will be be the only ones there tomorrow Phone #: ###-#### Inspection requested via web by Peter Harris//need blower door test//move combo smoke/co near master to 3 feet away from return duct//
|
BLD-Energy code compliance | 3/25/2020 | 3/27/2020 | 3/27/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Peter Harris
|
BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####
|
BLD-Wall Bracing | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
Tell Riley
|
|
|
Christina Phone #: ###-####
|
BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Tell Riley
|
|
|
Brian Phone #: ###-####//wall ok//
|
BLD-Footing | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PART |
Tell Riley
|
|
|
Brian Phone #: ###-####//contractor is diging out frost areas and heating with torches onsite//WIP with frost//pour at own risk if frost is not completly removed//areas outside of shade ground temps ok and no frost//
|
BLD-Footing | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | FAIL |
Tell Riley
|
|
|
Brian Phone #: ###-####//1/2 of footings subgrade frozen//
|