BLD-Framing/Rough-in | 8/12/2020 | 8/12/2020 | 8/12/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to start cover, will need to see around beams and 2 hr wall in location that need extended to roof deck//
|
BLD-Wall cover | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Tell Riley
|
|
|
Partywall shear Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Energy code compliance | 7/28/2020 | 7/28/2020 | 7/28/2020 | A | PART |
Tell Riley
|
|
|
Final Framing/Energy Phone #: ###-#### Inspection requested via web by Shane Shade//minor corrections, ok to hang separation wall will need to check for shear nailing//
|
BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PART |
Tell Riley
|
|
|
framing/foam seal Phone #: ###-#### Inspection requested via web by Shane Shade//see Crystal and Shane onsite for list of corrections//ok to insulate in areas not affected by corrections//
|
BLD-Framing/Rough-in | 7/20/2020 | 7/20/2020 | 7/21/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//ok to air seal 2 hr walls, insulate//ok to air seal and insulate front and rear walls that require OSB sheathing on inside//add anchor bolts and/or nuts//
|
BLD-Framing/Rough-in | 7/13/2020 | 7/13/2020 | 7/13/2020 | A | PART |
Tell Riley
|
|
|
Tr,uss/consultation Phone #: ###-#### Inspection requested via web by Shane Shade//truss bracing ok//provide engineering for mechanical added to attic space//
|
BLD-Framing/Rough-in | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | NR |
Tell Riley
|
|
|
Truss Phone #: ###-#### Inspection requested via web by Shane Shade//need to add truss bracing and nail hangers//
|
BLD-Wall Bracing | 6/12/2020 | 6/12/2020 | 6/12/2020 | A | PART |
Tell Riley
|
|
|
Final shear Phone #: ###-#### Inspection requested via web by Shane Shade//Exterior nailing and strapping//need to add straping above windows and at sill plates per type 3 shear details//add nails as dicussed--shane will verify prior to covering with wrap//
|
BLD-Wall Bracing | 6/8/2020 | 6/8/2020 | 6/8/2020 | A | PART |
Tell Riley
|
|
|
1st floor shear Phone #: ###-#### Inspection requested via web by Shane Shade//1st floor shear nailing re-inspection//nails were added in areas in accordance with shear schedule//
|
BLD-Wall Bracing | 6/4/2020 | 6/4/2020 | 6/4/2020 | A | PART |
Tell Riley
|
|
|
//add nailing per shear schedule-in areas on wall marked in green-other areas on first floor appear to be ok//this inspection was for exterior nailing on the first floor only//will call in foe re-inspction//
|
BLD-Concrete | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade//vapor barrier and insulation ok//
|
BLD-Concrete | 4/2/2020 | 4/2/2020 | 4/2/2020 | A | CANC |
Tell Riley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shane Shade Inspection cancelled from web by: Shane Shade
|
BLD-Foundation | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Foundation | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Foundation | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Footing | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|