Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD19-04969
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6057 E FOXGROVE DR
Project Namelot 13 block 2 harris north 3
Customer Number 
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 3746 sq. ft., two story (first story 2544 sq. ft., second story 1202 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 428 sq. ft. of covered patio/porch and a 730 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. No fire sprinkler required*MAS* D_S A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20207/20/20207/20/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled7/20/20207/20/20207/20/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/20/20207/20/20207/20/2020PDONE
DetailsBrandon Shaw
ACH50- 3.86
BLD-Final7/17/20207/17/20207/17/2020PNR
DetailsBrandon Shaw
Need PW approval...
BLD-Other4/13/20204/13/20204/13/2020PPASS
DetailsDave Hannah
Soffit. Can you do this morning when you inspect 22-2 HN? Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance4/3/20204/6/20204/6/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in4/1/20204/2/20204/2/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing3/5/20203/5/20203/5/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation2/17/20202/18/20202/18/2020APASS
DetailsJim Storey
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing2/14/20202/14/20202/14/2020APASS
DetailsBrandon Shaw
Work in progress...
Frost protection is required...
BLD-Footing2/13/20202/13/20202/14/2020PNR
DetailsDave Hannah
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell