Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD19-04980
StatusIssued
Name JORDAN WILCOMB CONSTRUCTION
Site Address 12475 W FRANKLIN RD
Project NameFranklin Commerce Ctr - Bldg 2
Customer Number 
ePlanReviewYes
Description
(FRANKLIN COMMERCE CENTER – BUILDING #2 - SHELL) The fire sprinkler system is used for building area increase and for fire area. To construct a new one story, 35,754 sq. ft. shell building. This is a shell only permit. This permit is NOT intended to establish a Certificate of Occupancy for any tenant. Future occupancies could include B, M, S-1, and F-1. Future tenants are required to apply for their own permit to establish occupancy. Approval is contingent upon adhering to the approved plans on file, DRH19-00263, attached engineering and plan review report. Work to include: site work, construction of concrete foundation and concrete slab, concrete tilt-up exterior wall panels, steel open-web roof girders, steel open-web roof joists, steel roof decking, rigid insulation installed on top or the roof deck with a single ply membrane roof covering, a 1-hr fire riser room with a door directly to the outside, exterior shade awnings, electrical work, mechanical work and plumbing work. Note: Special inspection is required, see attached 310 form. The building fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Concrete6/3/20206/3/20206/3/2020PPART
DetailsMike Jordan
Gene *screened* Phone #: ###-####. 7 Panels ok pending special inspection.
BLD-Footing5/5/20205/5/20205/6/2020PPART
DetailsMike Jordan
Gene Phone #: ###-####
BLD-Foundation4/28/20204/29/20204/29/2020APART
DetailsMike Jordan
Gene Pour time at 12 Phone #: ###-####. East and west step footings and north footing line. Work in progress. ok to place concrete pending special inspection.
BLD-Footing4/24/20204/24/20204/24/2020PDEFR
DetailsMike Jordan
Sreened-Rebar-Jean Phone #: 208-###-####. Interior column pad footings, ok pending special inspection.
BLD-Footing4/14/20204/15/20204/15/2020APASS
DetailsMike Jordan
Jean ***cleared*** Phone #: ###-####. south exterior footing ok.