BLD-Foundation | 8/10/2020 | 8/11/2020 | 8/11/2020 | P | PART |
Tell Riley
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate //work in progress....adding 2nd bar for 2 bars in top of wall, cutting verts for clearance//
|
BLD-Footing | 8/9/2020 | 8/10/2020 | 8/10/2020 | A | PART |
Tell Riley
|
|
|
Phone #: 6971241 >> Inspection requested via mobile web by Heron //footings ok,, setbacks ok on sides and front//rear has a 1' pop out into setback, talked with contractor on phone, they will be deleting the popout, a plan modification will be completed//WIP on footings and rear pending plan modification approval//
|
BLD-Footing | 8/6/2020 | 8/7/2020 | 8/7/2020 | P | CANC |
Tell Riley
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by heron Inspection cancelled via mobile web on Friday, August 07, 2020.
|
BLD-Footing | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | FAIL |
Tell Riley
|
|
|
need small documents and form 310 for special inspections//site plan shows rear setback of 10 feet minimum, current site conditions set at 8'//talked with general contractor, will need to submit for 8' setback or meet minimums on site plan A101//
|
BLD-Other | 7/13/2020 | 7/14/2020 | 7/14/2020 | A | CANC |
Brandon Shaw
|
|
|
Erosion inspection Phone #: ###-#### Inspection requested via web by Todd Campbell
|