BLD-Final | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Dave Hannah
|
|
|
Back filled per Engineering...
|
DOC - Permit Finaled | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 2/18/2020 | 2/18/2020 | 2/18/2020 | P | CANC |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | DONE |
Brandon Shaw
|
|
|
See documents for special inspection, date 2/13/20... OK to back fill, call for final...
|
BLD-Footing | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | NH |
Brandon Shaw
|
|
|
As per phone conversation- need both ends of footing dug out to verify footing dimentions are as per plans... Need Special inspection for as built footings and foundation, X-ray/ultra-sound to verify rebar is as per Engineering...
|
BLD-Footing | 1/27/2020 | 1/28/2020 | 1/28/2020 | P | PART |
Bob Archibald
|
|
|
John- Phone #: ###-####. Geotech received by PW. Footing and wall placed. No approved plans.
|
BLD-Footing | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | FAIL |
Brandon Shaw
|
|
|
See MIS19-00406 SWO... No Permit, Engineering, or city approved plans on site... Footings and foundation already poured and backfilled... Need Engineer of Record approval...
|