Permit Information
Permit NumberBLD20-00113
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5833 E FOXGROVE DR
Project NameLOT 22 BLOCK 2 HARRIS NORTH #3
Customer Number 
ePlanReviewYes
Description
***W.U.I. FOOTHILLS LOT ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED*** Permit for the construction of a new 3322 sq. ft., two story (first story 2374 sq. ft., second story 948 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 382 sq. ft. of covered patio/porch and a 1052 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning.***RDP*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20207/31/20207/31/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled7/31/20207/31/20207/31/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/31/20207/31/20207/31/2020ADONE
DetailsBrandon Shaw
ACH50- 4.36
BLD-Other4/15/20204/15/20204/15/2020PPASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance4/14/20204/15/20204/15/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kyle Seick soffits look ok to
BLD-Framing/Rough-in4/13/20204/13/20204/13/2020APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing3/19/20203/20/20203/20/2020APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other3/17/20203/18/20203/18/2020PFAIL
DetailsTell Riley
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick//needed shear//CN posted//need hold downs, finsish nailing// hot dip nails in PT//
BLD-Foundation2/27/20202/27/20202/27/2020PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing2/26/20202/26/20202/26/2020PPASS
DetailsBrandon Shaw
Work in progress...