BLD-Blower Door Test Results | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | CANC |
Tell Riley
|
|
|
4.38 ACH 50
|
BLD-Final | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Tell Riley
|
|
|
Front door is open Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
DOC - Permit Finaled | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 5/27/2020 | 5/28/2020 | 5/28/2020 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final.
|
BLD-Energy code compliance | 4/7/2020 | 4/7/2020 | 4/7/2020 | P | PASS |
Mike Jordan
|
|
|
Areas in draft stop have been sealed with fire foam. Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Energy code compliance | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Still needs to seal penetrations in draft stop.
|
BLD-Framing/Rough-in | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 4/1/2020 | 4/3/2020 | 4/3/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail C3G 2ply per the engineering. Provide additional 2x studs under 2ply in garage, both ends. Seal all penetrations in draft stop and complete portion under stairs. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Mike Jordan
|
|
|
unknown caller Phone #: ###-####
|
BLD-Foundation | 2/25/2020 | 2/26/2020 | 2/26/2020 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 2/24/2020 | 2/25/2020 | 2/25/2020 | P | PART |
Mike Jordan
|
|
|
Jerry Phone #: ###-####
|