BLD-Conference | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | CANC |
Tell Riley
|
|
|
Screened // Robert Phone #: ###-####
|
BLD-Final | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PASS |
Tell Riley
|
|
|
ok when furnace conduit is sealed at the separation wall in garage--let contractor know//
|
DOC - Permit Finaled | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/24/2020 | 7/27/2020 | 7/27/2020 | P | FAIL |
Tell Riley
|
|
|
Robert - */Screened*/ Phone #: ###-####//plumbing inspection was canceled--need to have final complete//plans show R49 attic insulation, tag show R38 was installed//remove dust covers from smoke detectors//
|
BLD-Blower Door Test Results | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | DONE |
Tell Riley
|
|
|
5.1 ACH 50
|
BLD-Final | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | NR |
Brandon Shaw
|
|
|
Need PLm final and blower door test...
|
BLD-Framing/Rough-in | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Tell Riley
|
|
|
Kerry - Screened for COVID 19 symptoms Phone #: ###-####//hardware added to truss per drawings//
|
BLD-Energy code compliance | 4/27/2020 | 4/27/2020 | 4/27/2020 | P | PASS |
Tell Riley
|
|
|
Kerry Phone #: ###-####
|
BLD-Framing/Rough-in | 4/23/2020 | 4/24/2020 | 4/24/2020 | A | PART |
Tell Riley
|
|
|
Screened-CAREY Phone #: ###-####//install TBE6 brackets on girder//other corrections ok//ok to insulate//
|
BLD-Framing/Rough-in | 4/21/2020 | 4/23/2020 | 4/23/2020 | A | FAIL |
Tell Riley
|
|
|
Screened- Carry Phone #: ###-####//see CN posted for framing fixes//
|
BLD-Energy code compliance | 4/21/2020 | 4/23/2020 | 4/23/2020 | A | CANC |
Tell Riley
|
|
|
Screened- Carry Phone #: ###-####
|
BLD-Wall Bracing | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | PART |
Tell Riley
|
|
|
No one will be onsite // Kerry Phone #: ###-####//nailing corrections made// hold downs still need to be added at portal frame//
|
BLD-Wall Bracing | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | FAIL |
Tell Riley
|
|
|
stated no one would be onsite..... shear // Kerry Phone #: ###-####//CN issued//need to add hot dip galvanized nails in PT//need to finish nailing portal frame and add hold downs in correct location//nail areas marked in red//
|
BLD-Foundation | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Tell Riley
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PART |
Tell Riley
|
|
|
Dane Phone #: ###-####//ok, setbacks tight on front and back//need to update plans to show no rebar in footing and wall//
|