BLD-Energy code compliance | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Tammy Schacher
|
FIRE-Final Inspection | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | CANC |
Jim Page
|
|
|
Called point of contact listed on 13MAY2020 to inform that this project does not require a life fire safety signature as listed in permit details. No return call was received as of this entry, this request is cancelled.
Insulation Inspection on Pool House Phone #: ###-#### Inspection requested via web by Tammy Schacher
|
BLD-Framing/Rough-in | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PASS |
Brandon Shaw
|
|
|
Garage Code # 2891 Pool House Framing Inspection Phone #: ###-#### Inspection requested via web by Tammy Schacher
|
BLD-Wall Bracing | 5/1/2020 | 5/4/2020 | 5/4/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Tammy Schacher
|
BLD-Foundation | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Brandon Shaw
|
|
|
*screened* Jared Phone #: ###-####
|
BLD-Foundation | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
BLD-Footing | 4/6/2020 | 4/7/2020 | 4/8/2020 | P | PEND |
Dave Hannah
|
|
|
screened // Jared Phone #: ###-####
|
BLD-Footing | 4/3/2020 | 4/6/2020 | 4/6/2020 | P | CANC |
Dave Hannah
|
|
|
clear // Jared Phone #: ###-####
|