BLD-Final | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Jim Storey
|
|
|
Kent *screened* Phone #: ###-#### final per the reviewed plan.
|
FIRE-Final Inspection | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work is complete, signature provided on permit sign off card.
Screened-Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Jim Storey
|
|
|
screened // kent Phone #: ###-#### si report/ engineer aproved beam c/n ok
|
BLD-Framing/Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | FAIL |
Jim Storey
|
|
|
call for access // Kent Phone #: ###-#### c/n s11// #8 and #10 not per design// engineer to field review and sub mit as built.
|
BLD-Framing/Rough-in | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Dave Hannah
|
|
|
*screened* - Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | NH |
Dave Hannah
|
|
|
Ken ***cleared*** Phone #: ###-####8 no one on site door is locked and no reply on phone
|