BLD-Wall Bracing | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Tell Riley
|
|
|
Luke - */Screened Call for access, no one at jobsite*/ Phone #: ###-####//interior side of 2 sided wall shear at garage front//nailing ok per engineering//
|
BLD-Framing/Rough-in | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PART |
Tell Riley
|
|
|
call for access // Luke Phone #: ###-####//add strapping to front wall take photos and installed shear panel//add bracing to girder truss//provide engineering ok for single king stud in place of 2 king studs listed on engineering//ok to insulate//
|
BLD-Wall Bracing | 6/5/2020 | 6/5/2020 | 6/5/2020 | P | PASS |
Tony Young
|
|
|
Luke *screeend* Phone #: ###-####/// ok after nailing off more in areas noted with paint
|
BLD-Foundation | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PART |
Tell Riley
|
|
|
Pat Phone #: ###-####//still need to set bolts and hold downs//otherwise ok -- WIP//
|
BLD-Footing | 3/6/2020 | 3/6/2020 | 3/6/2020 | P | PART |
Tell Riley
|
|
|
Based on PDS online mapping in relation to property,site measument is 20+ feet to side walk to addition- 15 feet required, which based on approved site plan is more than 15 to property in relation to PDS mapping on side setbacks//front and rear maintain existing// dig out for 3x3 pads as discussed//
|
BLD-Footing | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | CANC |
Tell Riley
|
|
|
Chris Phone #: ###-####//spoke with Chris, needs to locate side pin for setback verification--asked to cancel//
|