BLD-Final | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Jim Storey
|
|
|
Robert Phone #: ###-####
|
FIRE-Final Inspection | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Alarm system repaired.
Robert Phone #: ###-####
|
BLD-Final | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | DEFR |
Jim Storey
|
|
|
Robert Phone #: ###-#### to pm need fire
|
FIRE-Final Inspection | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | FAIL |
Troy Cobbley
|
|
|
The door hardware and the annual inspection for the fire sprinkler system is ok but the fire alarm panel is in trouble with a phone line 2 fault. Robert Phone #: ###-####
|
BLD-Final | 3/5/2020 | 3/6/2020 | 3/9/2020 | P | CANC |
Jim Storey
|
|
|
Megan Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2020 | 3/6/2020 | 3/6/2020 | A | FAIL |
Troy Cobbley
|
|
|
Remove deadbolt at the rear door, provide verification of annual inspection of the sprinkler inspection. I agreed that if the two above items are addressed I would give a temp. for life safety until the Dark Room is built. A permit for the addition of a sprinkler head will require a permit. I also noted that electrical and mechanical permits may be required due to the new equipment.
Megan Phone #: ###-####
|