Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD20-00523
StatusIssued
Name VERTICAL CORP
Site Address 781 W SANDSTONE CT
Project Name 
Customer Number 
ePlanReviewYes
Description
***04/20/20 PLAN MODIFICATION TO RELOCATE ORIGINALLY PERMITTED STAIRWAY, REMOVE AND REPLACE ROOF WITH ENGINEERED TRUSS SYSTEM, CHANGE 2ND LEVEL WALL HEIGHT FOM 7'-8" TO 8'-11 1/4", 2ND LEVEL FRONT BEDROON TO GET AN ADDITION. ***W.U.I. HILLSIDE LOT ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED*** Permit for a remodel to include;..Basement Level: Addition of new Bedroom, Flex Room, Laundry Room and relocation of water heater. A new Window Well will also be added for egress.
Ground Level: Existing Laundry Room off of garage to be replaced with a new Powder Room.
Main Floor Level: Demo closet at front door and wall between living and dining rooms and add railing. Re-configure bathroom and bedrooms. Demo and re-configure kitchen. Demo step between Nook and Family Room and cut open floor for new stairway to basement. Demo a portion of existing back patio and add a 180 sq. ft. remodeled bathroom addition to Master Bedroom.
Existing Truss System: Modify existing Truss system to add new Trusses to raise ceiling and add W.U.I. compliant Skylight. Exterior: New Cedar Wrapped Window alteration on West Elevation. All work per plans, notes, engineering, & local code. Separate electrical, plumbing & mechanical permits required. **RDP** *** CAT I Hillside Permit; A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.***

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/5/20208/5/20208/7/2020 PEND
DetailsTony Young
BLD-Aging Inspection8/4/20208/4/20208/5/2020 PEND
DetailsTony Young
BLD-Conference6/29/20206/29/20206/29/2020PPART
DetailsTony Young
screened // call when on the way .... kent Phone #: ###-####?s on frame,, need plans to meet what is built via architect
BLD-Footing3/23/20203/23/20203/23/2020PPASS
DetailsJim Storey
BLD-Footing3/20/20203/23/20203/23/2020ANR
DetailsJim Storey
JEFF Phone #: ###-####
BLD-Footing3/13/20203/16/20203/16/2020ANR
DetailsBrandon Shaw
Need Geo subsoil submitted to and approved by PW...
BLD-Footing3/6/20203/9/20203/9/2020ANR
DetailsMike Jordan
Jeff Phone #: ###-####. Needs geo-tech soils report.
BLD-Framing/Rough-in8/13/20208/14/2020 A 
DetailsTony Young
Screened- KEnt Phone #: ###-####