BLD-Final | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | NH |
Tell Riley
|
|
|
Kitchen Inspection requested via web by David Thompson//both gates closed, no cars in driveway, does not appear to be anyone home, no contact phone number//home is occupied and will possibly need to have inspection completed virtually//
|
FIRE-Final Inspection | 8/10/2020 | 8/11/2020 | 8/10/2020 | A | CANC |
Troy Cobbley
|
|
|
Kitchen Remodel >> Inspection requested via web by David Thompson Inspection cancelled from web by: David Thompson
|
BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PART |
Brandon Shaw
|
|
|
Shop only...
|
BLD-Wall cover | 5/22/2020 | 5/26/2020 | 5/26/2020 | A | PASS |
Brandon Shaw
|
|
|
Kitchen Remodel of house Inspection Interior ok to cover...
|
BLD-Energy code compliance | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PART |
Tell Riley
|
|
|
Inspection requested via web by David Thompson//wall insulaiton R-21 per plans//attic show R30, add soffit vents and baffles for attic ventilation//
|
BLD-Framing/Rough-in | 5/6/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Dave Hannah
|
|
|
Inspection requested via web by David Thompson
|
BLD-Wall Bracing | 4/21/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
Tell Riley
|
|
|
Shear inspection Phone #: ###-#### Inspection requested via web by David Thompson//corrections made// nails added at front and rear walls, staples used for conversion on side wall per engineering//hot dipped nails used in pt//
|
BLD-Footing | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PART |
Tell Riley
|
|
|
picture of footing for point load was provided where it was needed, per the correction notice from wall inspection///appears to be rebar installed in the photo//
|
BLD-Wall Bracing | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | FAIL |
Tell Riley
|
|
|
Need a shear wall inspection Phone #: ###-#### Inspection requested via web by David Thompson//CN posted, need to nails or staple with correct size staples front and rear shear walls//remove wrap in areas to verify staples//add hot dip galvanized nails at pt plate//add anchor bolts at plate ends//
|
BLD-Footing | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PART |
Tell Riley
|
|
|
Post and beam placement footings Phone #: ###-#### Inspection requested via web by David Thompson//ok when footing extends per plans at stairs,, need to set CBS post base per plans//
|
BLD-Foundation | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | PART |
Tony Young
|
|
|
stem wall // David Phone #: ###-####// missed a footing point load,, need to get a fix and show the next inspector when the slab footings are called in,, work in progress.. ok to pour stem wall when ready
|
BLD-Foundation | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | CANC |
Dave Hannah
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 3/2/2020 | 3/2/2020 | 3/2/2020 | A | PASS |
Dave Hannah
|
|
|
|