BLD-Final | 8/12/2020 | 8/13/2020 | 8/13/2020 | P | PART |
Dave Hannah
|
|
|
Curtis *screened* Phone #: ###-#### ok for tco phase one everything south of 3hr firewall
|
FIRE-Final Inspection | 8/6/2020 | 8/13/2020 | 8/13/2020 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection for TCO phase 1 complete, fire alarm for phase 1 TCO complete, fire extinguishers for TCO phase 1 area are placed with current inspection tags. Push button for access controlled doors to be raised between 40 to 48 inches as discussed. Three exit signs to be added and 2 too be relocated as discussed. Will verify noted items on final life fire safety phase 2 inspection. Life fire safety for TCO phase 1 is complete, signatures provided on permit sign off card for TCO phase 1.
Curt *screened* Phone #: ###-####
|
FIRE-Alarm Testing | 8/12/2020 | 8/13/2020 | 8/12/2020 | A | CANC |
Jim Page
|
|
|
Fire alarm inspection has been requested under the fire alarm FIR permit, this request is cancelled.
Screened- Curtis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PART |
Dave Hannah
|
|
|
Curtis *screened Phone #: ###-#### ok to cut in perimator
|
BLD-Ceiling Grid Inspection | 8/6/2020 | 8/6/2020 | 8/7/2020 | P | PART |
Dave Hannah
|
|
|
Curt *screened* Phone #: ###-#### nw corner ok
|
FIRE-Conference | 8/3/2020 | 8/4/2020 | 8/4/2020 | A | DONE |
Jim Page
|
|
|
Fire conference is complete.
Curtis *screened* Phone #: ###-####
|
FIRE-Conference | 7/31/2020 | 8/3/2020 | 8/3/2020 | A | CANC |
Jim Page
|
|
|
Was scheduled for 04AUG2020, this request is cancelled.
Curtis *screened* Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/30/2020 | 7/31/2020 | 8/1/2020 | P | PART |
Dave Hannah
|
|
|
Screened- Curtis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/24/2020 | 7/27/2020 | 7/24/2020 | A | PART |
Dave Hannah
|
|
|
SCREENED // Curtis Phone #: ###-#### ok to cut in bourders
|
BLD-Ceiling Grid Inspection | 7/21/2020 | 7/21/2020 | 7/21/2020 | P | PART |
Brandon Shaw
|
|
|
*screened* Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/9/2020 | 7/10/2020 | 7/10/2020 | A | PART |
Mike Jordan
|
|
|
Curtis - /*Screened*/ Phone #: ###-####. Luncroom and last meeting room ok pending fire and mech. Ok for borders.
|
BLD-Framing/Rough-in | 6/24/2020 | 6/24/2020 | 6/24/2020 | P | PART |
Dave Hannah
|
|
|
screened // Curtis Phone #: ###-#### fire caulking on 2hr wall ok
|
BLD-Ceiling Grid Inspection | 6/16/2020 | 6/16/2020 | 6/17/2020 | P | PART |
Dave Hannah
|
|
|
screened // Curtis Phone #: ###-#### parts of south end ok to flood
|
BLD-Ceiling Grid Inspection | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | PART |
Dave Hannah
|
|
|
Curtis Phone #: ###-#### ok to cut in bourders
|
BLD-Ceiling Grid Inspection | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PART |
Dave Hannah
|
|
|
Screened- Curtis Phone #: ###-#### ok to cut in bourders after elec oks
|
BLD-Framing/Rough-in | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Jim Storey
|
|
|
Curtis Phone #: ###-#### ceilling and walls ok center restarooms// north partions of 4 hr wall ok to cover.
|
BLD-Framing/Rough-in | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PART |
Dave Hannah
|
|
|
Curtis *screened* Phone #: ###-#### sw corner ok to cover
|
BLD-Framing/Rough-in | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
Jim Storey
|
|
|
Curtis Phone #: ###-#### interior walls ok to cover only
|