Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD20-00865
StatusIssued
Name CANYON CREST HOMES
Site Address 4138 N HAWKEYE PL
Project Name2-6 Eyrie Canyon
Customer Number 
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 4084 sq. ft., two story (first story 2764 sq. ft., second story 1320 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 402 sq. ft. of covered patio/porch and a 1561 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. **D_S** Sprinklers are not required***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing8/10/20208/11/20208/11/2020APASS
DetailsTony Young
Is it OK to have an attic access above a stacked washer/dryer? Phone #: ###-#### Inspection requested via web by David Wipper// yes and exterior ok to cover
BLD-Foundation7/24/20207/27/20207/27/2020APASS
DetailsTony Young
screened // CHarlie Phone #: ###-####
BLD-Footing7/24/20207/24/20207/24/2020PPART
DetailsTony Young
screened // CHarlie Phone #: ###-####// small rear planter/ retaining wall footing
BLD-Foundation6/22/20206/22/20206/22/2020PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation6/19/20206/22/20206/22/2020ANR
DetailsDave Hannah
Victor Phone #: ###-####
BLD-Footing6/16/20206/16/20206/16/2020PPASS
DetailsTony Young
Victory *Screened* Phone #: ###-####
BLD-Footing6/15/20206/16/20206/16/2020ANR
DetailsTony Young
Victory *Screened* Phone #: ###-####// needs soils approval 1st