BLD-Energy code compliance | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | FAIL |
Brandon Shaw
|
|
|
Insulation installedproir toframing inspection... cannot verifyheaders/beams through out exterior walls... See pg S1.1- tall wall notes, stud spacing and CS straping/ with blocking... See pg S1.1 detail #2 for shear wall transfer and red marks pg S3.0 for location...
|
BLD-Other | 6/10/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/13/2020 | 4/14/2020 | 4/14/2020 | P | PART |
Tell Riley
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell //WIP//
|
BLD-Footing | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|