BLD-Energy code compliance | 5/22/2020 | 5/26/2020 | 5/26/2020 | P | PASS |
Tell Riley
|
|
|
Jason Phone #: ###-####//shear corrections were made and photos sent//insulation ok whne completed//window next to door needs to have both panes safety glazed prior to final//
|
BLD-Framing/Rough-in | 5/21/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Tell Riley
|
|
|
Screened- Jason Phone #: ###-####//ok to insulate//
|
BLD-Wall Bracing | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | NH |
Tell Riley
|
|
|
virtual inspection requested // Jason Phone #: ###-####//left VM, exterior shear, should be able to perform onsite inspeciton//no one onsite, no answer on phone, will need to reshedule when someone is onsite or I have access to back//
|
BLD-Footing | 3/31/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Timmons//setbacks inline with site plan and zoning document--same plane as exisitng house//WIP on walls and footings//
|
BLD-Footing | 3/30/2020 | 3/31/2020 | 3/31/2020 | P | CANC |
Tell Riley
|
|
|
Would like to inspect between 1 and 2 pm. Thanks Phone #: ###-#### >> Inspection requested via web by Jason Timmons Inspection cancelled from web by: Jason Timmons
|