BLD-Concrete | 8/5/2020 | 8/6/2020 | 8/6/2020 | P | CANC |
Dave Hannah
|
|
|
late pm, screened - rebar // Mike Phone #: ###-####
|
BLD-Concrete | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | PART |
Dave Hannah
|
|
|
slab on grade ok
|
BLD-Other | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | PASS |
Dave Hannah
|
|
|
SCREENED // grout... as late as possible // Mike Phone #: ###-####
|
BLD-Footing | 7/13/2020 | 7/14/2020 | 7/17/2020 | P | PART |
Dave Hannah
|
|
|
Mike *screened* Phone #: ###-#### strct engineer and spec inspection both have ok rebar
|
BLD-Footing | 7/10/2020 | 7/13/2020 | 7/13/2020 | P | PEND |
Mike Jordan
|
|
|
Mike *screened* Phone #: ###-####. Grade beams. Noted that wngineer will be on site tomorrow morning to inspect reinforcement as well. Ok pending engineer approval. Stamped city plans not on site at time of inspection.
|
BLD-Footing | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | PART |
Dave Hannah
|
|
|
screened // Mike Phone #: ###-#### needs to resubmit struc foundation plan aproved by struc engineer crew will place conrete at their own risk
|
BLD-Conference | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | DONE |
Mike Jordan
|
|
|
Needs to provide approved mix designs for concrete. Also needs to upload plan mod for udated structural sheet S1.11 showing new grade beam layout. Contractor want to place concrete Monday morning June 29th. Noted to contractor (Visser) that they will be placing concrete at their own risk and any non conformances will be repaired or replaced.
|
BLD-Footing | 6/11/2020 | 6/11/2020 | 6/12/2020 | P | PEND |
Dave Hannah
|
|
|
Screened- around 3pm, if possible- Jay Phone #: ###-#### ok after spec inspection okls
|