BLD-Final | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Tell Riley
|
|
|
Jeff - */Screened/* Phone #: ###-####//corrections have been completed//parking meets site plan//no other work on exterior or parking areas//ACHD email was reviewed onsite//
|
BLD-Final | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | NR |
Tell Riley
|
|
|
Jeff - To determine requirements for TCO */Screened*/ Phone #: ###-####//need mechanical final//discussed requirements for accesible restroom, breakroom//accessible parking space needs to meet plans//existing accessible ramp--no new work on exterior//used a conference//
|
FIRE-Final Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
Jeff - To determine requirements for TCO */Screened*/ Phone #: ###-####
|
FIRE-Final Inspection | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | PASS |
Troy Cobbley
|
|
|
life safety passed,
###-####
|
BLD-Final | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | CANC |
Tell Riley
|
|
|
Jeff -*/Screened*/ Phone #: ###-####//needs mechanical finaled//need to have grid accessible for inspection//will need ACHD approval for final//
|
BLD-Wall cover | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Tell Riley
|
|
|
screened - call for access // Sam Phone #: ###-####//ok to cover walls only//call for grid when ready//submit site plan for plan mod prior to final as it does not reflect the current conditions//
|
BLD-Framing/Rough-in | 6/22/2020 | 6/23/2020 | 6/23/2020 | P | PART |
Tell Riley
|
|
|
call ahead for access - lockbox - screened // *Jeff/ Sam Phone *###-####// ###-####//CN posted//window framing does not reflect plans or engineering//maintain finished corridor widths per plans//ok to insulate only//
|