BLD-Final | 7/8/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
DOC - Permit Finaled | 7/9/2020 | 7/9/2020 | 7/9/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 5/13/2020 | 5/14/2020 | 5/14/2020 | P | PASS |
Tony Young
|
|
|
Lock box code is 208 key is inside. Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Energy code compliance | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PEND |
Tony Young
|
|
|
Lock box code is 208 key is inside. Phone #: ###-#### Inspection requested via web by Scott Asin// ok pending mechanical pass
|
BLD-Framing/Rough-in | 5/7/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Dave Hannah
|
|
|
Lock box code is 208 and key is inside of the box incase the door is locked. Phone #: ###-#### Inspection requested via web by Scott Asin
|