BLD-Final | 7/29/2020 | 7/30/2020 | 7/30/2020 | P | PASS |
Tell Riley
|
|
|
Bridger *screened* Phone #: ###-####//final is complete//
|
FIRE-Final Inspection | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Bridger *screened* Phone #: ###-####
|
DOC - Permit Finaled | | | 7/30/2020 | | DONE |
|
|
|
final inspection was completed 7-30-2020 and permit is not for occupancy
|
BLD-Ceiling Grid Inspection | 7/21/2020 | 7/22/2020 | 7/23/2020 | A | PASS |
Tell Riley
|
|
|
Bridger ###-####//grid ok per the plans//
|
BLD-Ceiling Grid Inspection | 7/20/2020 | 7/21/2020 | 7/21/2020 | P | NR |
Tell Riley
|
|
|
workers came in from out of state in the last few days // late afternoon if possible ..... Bridger Phone #: ###-####//need fire sprinkler and electrical--they are scheduled for tomorrow am//tis inspection has also been rescheduled//
|
BLD-Framing/Rough-in | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PART |
Tell Riley
|
|
|
screened // Shawn Phone #: ###-####//framing in areas that do not have plumbing ok, shawn will send photos of headers and jambs when installed//electrical rough approved//brace wall at office with 45 degree bracing//
|