Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD20-01402
StatusIssued
Name BENITON CONSTRUCTION
Site Address 8055 W GODDARD RD
Project NameCapital High School Auditorium
Customer NumberBLD20-01618 EARLY START
ePlanReviewYes
Description
**EXPEDITED SCHOOL REVIEW** PM-Ron Hill** (CAPITAL HIGH SCHOOL AUDITORIUM) (BLD20-01618 Early Start) Permit for a minor remodel to the existing High School auditorium and five 2nd floor classrooms. Work to include: remodeling existing restrooms, adding accessible single-user restroom, extending stage, new stairs and accessible ramp to the stage, mechanical, electrical, and plumbing work, and interior finishes in compliance with Ch. 8 of the 2015 IBC. Special Inspections required per the attached Form 310. Deferred Submittal for Metal Stairs and Handrails and Cable Guardrail System. This is a scope of work permit with a certificate of completion to be issued upon approval and completion of the designated work. Risk Category III. This building is partially fire sprinklered for occupancy and area with a pending upgrade agreement. The upgrade agreement is attached in the documents. Fire sprinklers and alarms will be extended into the auditorium and classrooms in compliance with the upgrade agreement under BLD11-00450. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/6/20208/6/20208/6/2020PPASS
DetailsTroy Cobbley
life safety passed. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Ceiling Grid Inspection7/30/20207/31/20207/31/2020APART
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Doug Storey//grid looks ok//Electrical passed//new RTU in end classroom will need to be inspected when installed//pending fire sprinkler approval//
BLD-Conference7/16/20207/17/20207/17/2020ADONE
DetailsTell Riley
Please call 30 min. prior to make sure we are onsite. Thank you. Phone #: ###-#### Inspection requested via web by Doug Storey
BLD-Wall Bracing7/10/20207/10/20207/10/2020PPASS
DetailsTell Riley
Phone #: ###-#### Inspection requested via web by Doug Storey//scope of permit needs to be updated to remove the phase of work for the auditorium//inspection is on the five classrooms only//wall brackets installed, located on opposite side of previously installed wall brackets to brace the CMU as directed by the architect//no structural details were provided for these brackets//appear to meet sizes per the plans//special inspections were completed for the anchors//