BLD-Framing/Rough-in | 6/12/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Tell Riley
|
|
|
Chuck ###-#### call first 15 mins//ok to continue, hardware added per enginering, engineering for rafters updated//still need verification of 2x8 deck joists as plans show 2x10s//home owner will get electrical permit and inspection prior to cover//
|
BLD-Framing/Rough-in | 6/12/2020 | 6/12/2020 | 6/12/2020 | P | NR |
Tell Riley
|
|
|
aaron Phone #: ###-####//used as conference to review updated engineering and discuss framing//some corrections were met and a few thing still need completed//
|
BLD-Framing/Rough-in | 6/8/2020 | 6/8/2020 | 6/8/2020 | P | NR |
Tell Riley
|
|
|
Aaron *screened* Phone #: ###-####//still need framing to match engineering or engineering to reflect as built porch and cover//need to add supprt to overbuild//footing size verified where new//existing footings need to be approved for use by engineer//
|
BLD-Framing/Rough-in | 6/1/2020 | 6/2/2020 | 6/2/2020 | A | FAIL |
Tell Riley
|
|
|
call access- Aaron *screened* Phone #: ###-####//cn issued//need deck and patio cover to reflect engineering and plans--may need engineer to re-evaluate the existing structure as it is already built//need verification of footing size and engineers ok for exisitng footings under the slab//open areas covered for inspection or overbuild and framing connections//deck framing needs to be per engineering//
|