BLD-Energy code compliance | 8/7/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Tell Riley
|
|
|
Scrrened- Kenvin Phone #: ###-####
|
BLD-Framing/Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | PASS |
Tell Riley
|
|
|
Kevin *screened* Phone #: ###-####//engineering letter provided for front truss frame wall--ok per engineering and letter//ok to insulate//
|
BLD-Wall Bracing | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | PART |
Tell Riley
|
|
|
SCREENED ....... requested as early as possible shear // Kevin Phone #: ###-####//add hot dip galvanized to PT plate//add straps, provide engineers ok on hold downs and single bottom plate for engineered portal frame at garage door//all other shear nailing areas ok per plans//
|
BLD-Foundation | 7/8/2020 | 7/9/2020 | 7/9/2020 | A | PASS |
Mike Jordan
|
|
|
late morning-Kevin *screened* Phone #: ###-####
|
BLD-Footing | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PART |
Tell Riley
|
|
|
Kevin *screened* Phone #: ###-####//front pin on north side located, contractor pulled lengths to mark south pin on property, based on measurements and plans the new shop strucuture appears to be outside the 5' setback requirement at roughly 7 plus feet--front are rear setbacks ok//WIP//
|