BLD-Final | 8/11/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Brandon Shaw
|
|
|
Disregard previous entry...
|
DOC - Permit Finaled | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | FAIL |
Brandon Shaw
|
|
|
Window in main floor bathroom to be tempered... Aif/foam seal not done at time of inspection... OK to insulate
|
BLD-Footing | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Brandon Shaw
|
|
|
Footing inspection can be done in the AM tomorrow. Alex will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | FAIL |
Mike Jordan
|
|
|
Footing permit can be done at anytime tomorrow. Subgrade is completed and has been emailed to Melissa and Jason. Thanks! Phone #: ###-#### Inspection requested via web by rich prasch. Footings are not min. 32X32x32 as per the enfineering.
|