INSP - Final | 8/5/1998 | | 8/5/1998 | | PASS |
|
|
|
WORK COMPLETED AND OTHER AGENCIES SIGNED OFF. THERE WAS NO CALL FOR INSP.
|
INSP - Final | 4/10/1996 | 4/10/1996 | 4/10/1996 | P | PASS |
|
|
|
|
Permanent Occupancy | | 4/10/1996 | 4/10/1996 | | DONE |
|
|
|
|
INSP - Final | 4/4/1996 | 4/5/1996 | 4/5/1996 | P | FAIL |
|
|
|
see permit BLD95-1412 needs electrical final.
|
INSP - Final | 2/22/1996 | 2/22/1996 | 2/22/1996 | P | CANC |
|
|
|
338 made insp.
|
INSP - Final | 2/22/1996 | 2/22/1996 | 2/22/1996 | P | FAIL |
|
|
|
02/22/96 338 -
|
INSP - Final | 2/16/1996 | 2/16/1996 | 2/16/1996 | P | PART |
|
|
|
TEMP OCCUPANCY. SEE 338.
|
INSP - Temporary occupancy | 2/15/1996 | 2/15/1996 | 2/15/1996 | | PASS |
|
|
|
/ / 338 - signed temp occ for the 1st floor meetimg rooms also the kit bathrooms. and the 2nd floor except for room 274
|
INSP - Framing/Rough-in | 2/9/1996 | 2/9/1996 | 2/9/1996 | P | PASS |
|
|
|
02/09/96 338 - for the total door framea framing at the 1st floor west
|
INSP - Wall cover | 2/9/1996 | 2/9/1996 | 2/9/1996 | | PASS |
|
|
|
/ / 338 -
|
INSP - Conference | 2/6/1996 | 2/6/1996 | 2/6/1996 | | PASS |
|
|
|
/ / 338 - CONF ON THE INSTALL OF THE TOTAL SMOKE DOORS 1ST FLOOR EAST
|
INSP - Framing/Rough-in | 2/5/1996 | 2/5/1996 | 2/5/1996 | P | PART |
|
|
|
02/05/96 338 -
|
INSP - Framing/Rough-in | 2/2/1996 | 2/2/1996 | 2/2/1996 | P | PASS |
|
|
|
02/02/96 338 - partial k to cover the door jambs and and install same pi ures are to be taken
|
INSP - Framing/Rough-in | 2/1/1996 | 2/2/1996 | 2/2/1996 | A | NR |
|
|
|
02/01/96 338 -
|
INSP - Framing/Rough-in | 2/1/1996 | 2/1/1996 | 2/1/1996 | P | PART |
|
|
|
02/01/96 338 -
|
INSP - Framing/Rough-in | 1/29/1996 | 1/30/1996 | 1/30/1996 | A | PASS |
|
|
|
01/29/96 338 - recieved details for the total smoke door to the 2-hour d
|
INSP - Conference | 1/24/1996 | 1/25/1996 | 1/25/1996 | A | PASS |
|
|
|
01/24/96 338 - done 01/23/96
|
INSP - Framing/Rough-in | 1/25/1996 | 1/25/1996 | 1/25/1996 | P | FAIL |
George Slane
|
|
|
01/25/96 38 -
|
INSP - Framing/Rough-in | 1/23/1996 | 1/23/1996 | 1/23/1996 | P | FAIL |
|
|
|
01/23/96 338 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 1/10/1996 | 1/10/1996 | 1/10/1996 | P | PART |
|
|
|
01/10/96 338 -
|
INSP - Framing/Rough-in | 12/27/1995 | 12/28/1995 | 12/28/1995 | A | PART |
|
|
|
12/27/95 338 - partial 09 ok
|
INSP - Framing/Rough-in | 12/26/1995 | 12/26/1995 | 12/26/1995 | P | NR |
|
|
|
12/26/95 338 - partial frame NEED TO RECALL CORR-CORREC-CALL FOR REINSP WHEN COMPLETED (VERBAL)
|
INSP - Framing/Rough-in | 12/21/1995 | 12/21/1995 | 12/21/1995 | P | PART |
|
|
|
12/21/95 338 -
|
INSP - Framing/Rough-in | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | PASS |
|
|
|
12/19/95 338 - PARTIAL MADE OK ONLY
|
INSP - Framing/Rough-in | 12/13/1995 | 12/13/1995 | 12/12/1995 | P | PART |
|
|
|
12/13/95 338 -
|
INSP - Framing/Rough-in | 12/11/1995 | 12/11/1995 | 12/11/1995 | P | PART |
|
|
|
12/11/95 338 - can light boxex ok only
|
INSP - Framing/Rough-in | 12/7/1995 | 12/7/1995 | 12/6/1995 | P | PART |
|
|
|
12/07/95 338 - partial
|
INSP - Conference | 12/6/1995 | 12/6/1995 | 12/6/1995 | | PASS |
|
|
|
/ / 338 - phone penetrations, installer
|
INSP - Conference | 12/6/1995 | 12/6/1995 | 12/6/1995 | | PASS |
|
|
|
/ / 338 - phone penetrations, installer
|
INSP - Framing/Rough-in | 12/6/1995 | 12/6/1995 | 12/6/1995 | | PART |
|
|
|
/ / 333 - helping Perry w/cn
|
INSP - Framing/Rough-in | 12/5/1995 | 12/6/1995 | 12/6/1995 | A | FAIL |
|
|
|
12/05/95 338 -
|
INSP - Conference | 12/5/1995 | 12/5/1995 | 12/5/1995 | | PASS |
|
|
|
/ / 338 -
|
INSP - Framing/Rough-in | 12/4/1995 | 12/4/1995 | 12/4/1995 | P | FAIL |
|
|
|
12/04/95 338 -
|
INSP - Framing/Rough-in | 11/29/1995 | 11/29/1995 | 11/29/1995 | P | PART |
|
|
|
11/29/95 338 - p
|
INSP - Framing/Rough-in | 11/21/1995 | 11/21/1995 | 11/21/1995 | P | PART |
|
|
|
11/21/95 338 -
|
INSP - Conference | 11/17/1995 | 11/17/1995 | 11/17/1995 | | PASS |
|
|
|
/ / 338 - W D LIGHTFOOT RESUBMITTALS
|
INSP - Framing/Rough-in | 11/16/1995 | 11/17/1995 | 11/17/1995 | P | PASS |
|
|
|
11/17/95 338 - partial frame 1st flr east corridor ok to insulate exterior walls must complete the caulk seal at top plate penetrations
|
INSP - Framing/Rough-in | 10/25/1995 | 10/26/1995 | 10/26/1995 | A | PART |
|
|
|
10/26/95 338 - SOUTH WST END 2ND FLOOR OK TO INSULATE.
|
INSP - Framing/Rough-in | 10/25/1995 | 10/25/1995 | 10/25/1995 | P | PASS |
|
|
|
10/25/95 338 - CANCELLED BY THECONTRACTOR
|
INSP - Framing/Rough-in | 10/19/1995 | 10/19/1995 | 10/19/1995 | P | PART |
|
|
|
|
INSP - Framing/Rough-in | 10/17/1995 | 10/18/1995 | 10/18/1995 | A | FAIL |
|
|
|
10/18/95 338 -
|
INSP - Conference | 10/16/1995 | 10/16/1995 | 10/16/1995 | | PASS |
|
|
|
/ / 338 - DROP OFF APROVED RESUBMITTALS PICK UP SMOKE ENCLOSURE DOORS DETAILS
|
INSP - Framing/Rough-in | 10/10/1995 | 10/10/1995 | 10/9/1995 | P | PASS |
|
|
|
10/10/95 338 -
|
INSP - Framing/Rough-in | 10/5/1995 | 10/6/1995 | 10/5/1995 | P | PASS |
|
|
|
10/06/95 338 - INSP DONE THIS AM CORRECTION NOTICE LEFT
|
INSP - Conference | 10/5/1995 | 10/5/1995 | 10/5/1995 | | PASS |
|
|
|
/ / 338 - CONFIRM APPMT TIME FOR TOMORROW.
|
INSP - Framing/ Rough-in | 10/5/1995 | 10/5/1995 | 10/5/1995 | | PART |
|
|
|
/ / 338 - C/N ISSUED
|
INSP - Conference | 10/2/1995 | 10/2/1995 | 10/2/1995 | | PASS |
|
|
|
/ / 338 - conduits to be firestopped
|
INSP - Framing/Rough-in | 9/28/1995 | 9/29/1995 | 9/29/1995 | P | PASS |
|
|
|
09/29/95 338 -
|
INSP - Conference | 9/25/1995 | 9/25/1995 | 9/25/1995 | P | PASS |
|
|
|
09/25/95 338 -
|
INSP - Conference | 9/11/1995 | 9/12/1995 | 9/12/1995 | A | PASS |
|
|
|
09/11/95 338 - must submit details for the wrap of the large I beabs in
|
INSP - Conference | 9/11/1995 | 9/11/1995 | 9/11/1995 | | PASS |
|
|
|
/ / 338 - FIRST INSP NEXT DAY
|
INSP - Framing/ Rough-in | 9/7/1995 | 9/7/1995 | 9/6/1995 | P | CANC |
|
|
|
09/07/95 338 -
|
INSP - Conference | 9/6/1995 | 9/6/1995 | 9/6/1995 | | PASS |
|
|
|
/ / 338 - LOOKED OVER THE FIRE BLOCKING AND THE PENETRATIONS OF THE SA FINE
|
INSP - Conference | 8/18/1995 | 8/18/1995 | 8/18/1995 | | PASS |
|
|
|
/ / 338 -
|
INSP - Conference | 8/16/1995 | 8/16/1995 | 8/14/1995 | P | PASS |
|
|
|
08/16/95 338 - HE IS SUPPOSE TO CALL YOU FOR A TIME.
|
INSP - Conference | 8/10/1995 | 8/11/1995 | 8/10/1995 | A | PASS |
|
|
|
08/10/95 338 - NEED RESUBMITALS ON THE TRELLIS ASSY IN THE COURTYARD APPROVED THE USE OF SOLID BLOCKING IN LEW OF RUNNING THE DRYWALL THROUGH THE LEDGER IN THE S
|
INSP - Footings | 7/5/1995 | 7/5/1995 | 8/7/1995 | P | CANC |
|
|
|
CANC 305
|
INSP - Carpentry | 8/2/1995 | 8/2/1995 | 8/2/1995 | P | PASS |
|
|
|
08/02/95 338 - pictures to show compliance
|
INSP - Foundation | 7/25/1995 | 7/25/1995 | 7/26/1995 | P | PASS |
|
|
|
07/25/95 338 - made ok elevator shaft made ok to floor grade
|
INSP - Footings | 7/20/1995 | 7/21/1995 | 7/20/1995 | A | PART |
|
|
|
07/21/95 338 - made ok
|
INSP - Foundation | 7/20/1995 | 7/20/1995 | 7/20/1995 | P | PASS |
|
|
|
07/20/95 338 - made ok r-bar placed ok
|
INSP - Conference | 7/19/1995 | 7/20/1995 | 7/19/1995 | A | PASS |
|
|
|
07/19/95 338 - MADE OK REJECTED RESUBMITTALS FOR THE 6X6 POST PROTECTION RESUBMIT
|
INSP - Foundation | 7/19/1995 | 7/19/1995 | 7/19/1995 | P | PART |
|
|
|
07/19/95 338 - passed by the special insp agcy
|
INSP - Footings | 7/17/1995 | 7/17/1995 | 7/17/1995 | P | PART |
|
|
|
07/17/95 338 - notre left with the contractor 1 need clasrification on the shear wall details 2.28.95 #7 also clarify horizontal shear panels and that common nails will be used 2 temperature
|
INSP - Foundation | 7/12/1995 | 7/12/1995 | 7/12/1995 | P | PART |
|
|
|
07/12/95 338 - MADE OK PARTIAL
|
INSP - Footings | 7/6/1995 | 7/7/1995 | 7/10/1995 | A | PART |
|
|
|
|
INSP - Miscellaneous | 7/7/1995 | 7/7/1995 | 7/10/1995 | P | PASS |
|
|
|
pre job conference made ok all subs present Jack frank present
|
INSP - Footings | 7/6/1995 | 7/7/1995 | 7/7/1995 | | CANC |
|
|
|
AM NOT READY
|