INSP - Final | 10/12/1995 | 10/12/1995 | 10/12/1995 | P | CANC |
|
|
|
10/12/95 333 -
|
INSP - Final | 10/11/1995 | 10/12/1995 | 10/12/1995 | P | PASS |
|
|
|
10/12/95 333 - LATE PM. FNL -OK FINAL
|
INSP - Letter of compliance | 10/12/1995 | 10/12/1995 | 10/12/1995 | | PASS |
|
|
|
/ / 333 - letter #10171 given to contractor
|
INSP - Framing/ Rough-in | 9/5/1995 | 9/6/1995 | 9/5/1995 | A | |
Jim Sly
|
|
|
|
INSP - Framing/ Rough-in | 9/5/1995 | 9/5/1995 | 9/5/1995 | P | |
Jim Sly
|
|
|
|
INSP - Conference | 8/31/1995 | 8/31/1995 | 8/31/1995 | P | FAIL |
Jim Sly
|
|
|
CONF.W/CONTRACTOR. REPOSTED C/N. C/N STILL IN EFFECT.
|
INSP - Framing/ Rough-in | 8/31/1995 | 8/31/1995 | 8/31/1995 | P | FAIL |
Jim Sly
|
|
|
ISSUED C/N ON FRAME. OK TO INSULATE. WILL CHECK C/N AT ENERGY INSPECTION.
|
INSP - Framing/ Rough-in | 8/30/1995 | 8/30/1995 | 8/30/1995 | P | FAIL |
Jim Sly
|
|
|
NOT READY. NEEDS PLUMBING & HTG.
|
INSP - Footings | 7/19/1995 | 7/20/1995 | 8/7/1995 | A | CANC |
Jim Sly
|
|
|
canc 305
|
INSP - Footings | 7/19/1995 | 7/20/1995 | 8/7/1995 | A | CANC |
Jim Sly
|
|
|
canc 305
|
INSP - Foundation | 7/21/1995 | 7/21/1995 | 7/21/1995 | P | PASS |
Jim Sly
|
|
|
|
INSP - Footings | 7/20/1995 | 7/20/1995 | 7/20/1995 | P | PASS |
Jim Sly
|
|
|
|