Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD95-00592
StatusFinaled
Name BOISE CITY FIRE STATION #2
Site Address 3551 N CARTWRIGHT RD
Project NameFIRE STATION #2
Customer Number 
ePlanReviewNo
Description
BOISE FIRE STATION #2-TO BUILD A NEW 7440 SQ. FT., ONE STORY, FIRE STATION BUILDING AND RELATED SITE IMPROVEMENTS. CONSTRUCTION TO BE WOOD AND STEEL FRAME, CONCRETE BLOCK, BRICK, WOOD TRUSSES, SYNTHETIC STUCCO, SHEET ROCK INTERIOR AND SUSPENDED CEILINGS. ALL PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THIS PROJECT IS SUBJECT TO HILLSIDE REVIEW, HS-16-94. CU-93-94, ANNEXATION #A-21-94 JCM/389-95 10/09/95 PROJECT $828,000 ELEC $85,546 PLMBG $32,736 MEC $47,400 FIRE SPRNK $15,200 INITIAL CERTIFICATE OF VALUE ON FILE LAS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Permanent occupancy7/31/19967/31/19967/12/1996
DetailsJoe Ray
PERM OCC. CERT. #6502 ISSUED 07/12/96 TO BOISE CITY FIRE STATION #2
Permanent Occupancy 7/12/19967/12/1996 DONE
Details
INSP - Final6/28/19967/1/19967/1/1996PPART
DetailsWes Worcester
MON. 1 P.M. temp occ ok
INSP - Final6/27/19966/27/19966/27/1996PNR
DetailsWes Worcester
FIRE DEPT HAS NOT SIGNED OFF, DID NOT GO OUT TO SITE, WILL ONCE FIRE DEPT HAS TESTED
INSP - Ceiling grid5/14/19965/14/19965/9/1996PPASS
DetailsWes Worcester
05/14/96 342 -
INSP - Framing/Rough-in2/21/19962/21/19962/21/1996PPASS
DetailsWes Worcester
ck w/mech insp for cover, everything else ok
INSP - Masonry2/16/19962/16/19962/16/1996PPART
DetailsWes Worcester
BRICK TIE CHECKED BY MTI
INSP - Framing/Rough-in2/12/19962/13/19962/13/1996APART
DetailsWes Worcester
ROOF c/n issued re: engineering and bracing
INSP - Conference1/30/19961/30/19961/30/1996PPART
DetailsWes Worcester
HE SAID YOU WOULD KNOW WHAT TIME FOR CONF......PICKED UP ENG INFO
INSP - Carpentry1/25/19961/25/19961/25/1996 PART
DetailsWes Worcester
/ / 342 -
INSP - Carpentry1/24/19961/25/19961/25/1996ANR
DetailsWes Worcester
01/24/96 342 - EXTERIOR GYP BOARD SHEATHING & FRAMING ENTRY OVERHANG....
INSP - Wall cover1/25/19961/25/19961/25/1996 PASS
DetailsWes Worcester
/ / 342 - ENTRY OK, GWB OK, DO TRUSS ENG
INSP - Conference1/22/19961/23/19961/24/1996APART
DetailsWes Worcester
01/23/96 342 - Met w/George, Bob, eng, Hassagawa, mason, spec insp, and substandard in West rig rm wall, spec insp noted missing rebar and eng h fix. Paul from Hassagawa claimed I didn't identify myself, just pointed truck. That isn't
INSP - Conference1/22/19961/22/19961/22/1996 PART
DetailsWes Worcester
/ / 342 - scheduled meeting for 9am Tues
INSP - Conference1/22/19961/22/19961/22/1996 PASS
DetailsWes Worcester
/ / 342 - called to change apt to our conference rm
INSP - Masonry1/22/19961/22/19961/22/1996 FAIL
DetailsWes Worcester
/ / 342 - rejected eng report. met MTI spec insp on site.
INSP - Wall cover1/19/19961/22/19961/22/1996ANR
DetailsWes Worcester
01/19/96 342 - SHEATHING NAILING.....missing nails and missing screws in
INSP - Framing/Rough-in1/19/19961/19/19961/22/1996PNR
DetailsWes Worcester
01/19/96 342 -
INSP - Carpentry1/20/19961/20/19961/20/1996 FAIL
DetailsWes Worcester
/ / 342 - went back as per Bob's direction after hours and trlr was lo of shr was covered. Note has not been ready for numerous inspections bot and special. Has an attituide when told what is not done and objects to
INSP - Framing/Rough-in1/20/19961/20/19961/20/1996 NR
DetailsWes Worcester
/ / 342 - no mech...actually wanted a shr nailing insp...which was rea roof nailing earlier in the week, but no mention of it at that time. Not walked away when he seen us drive on site. I went to job shack trlr wher ignored me while
INSP - Roof1/17/19961/17/19961/17/1996 PART
DetailsWes Worcester
/ / 342 - blking of trusses not nailed to roof sheathing. notified sup attitude problem. trying to maintain a report, but it is getting more difficult. architect submitting change order for nailing schedules
INSP - Roof1/16/19961/16/19961/16/1996PNH
DetailsWes Worcester
01/16/96 342 - ROOF NAILING. gate locked
INSP - Flatwork12/20/199512/20/199512/20/1995PPASS
DetailsWes Worcester
12/20/95 342 - poured w/ special insp
INSP - Flatwork12/18/199512/19/199512/19/1995APART
DetailsWes Worcester
12/19/95 342 - POURING AT 10:30 A.M.
INSP - Flatwork12/15/199512/15/199512/15/1995PPART
DetailsWes Worcester
slab pour. POURING AT 9 A.M. THEY FORGOT TO CALL. THERE IS A SPECIAL INSP. ON THE JOB.
INSP - Foundation11/30/199512/1/199512/1/1995APASS
DetailsWes Worcester
12/01/95 342 - RETAINING WALLS & PIERS.....POURING AROUND 10 A.M. piers ok'd by 342, not ready this am
INSP - Footings11/29/199511/29/199511/29/1995 PASS
DetailsWes Worcester
/ / 342 - South retaining wall ok
INSP - Footings11/28/199511/29/199511/29/1995PFAIL
DetailsWes Worcester
11/29/95 342 - retaining wall 2 pm changed to 1 pm, rebar in dirt and not enough cover at btm & side, South
INSP - Masonry11/28/199511/29/199511/29/1995PPASS
DetailsWes Worcester
11/29/95 342 - bond beam 12:30 entire top or last lift ok
INSP - Miscellaneous11/29/199511/29/199511/29/1995 NR
DetailsWes Worcester
/ / 342 - Radon membrane inspection
INSP - Masonry11/27/199511/28/199511/28/1995ANR
DetailsWes Worcester
11/28/95 342 - GROUT BOND BEAM no one there for masonry or supervision ì
INSP - Masonry11/28/199511/28/199511/28/1995 PART
DetailsWes Worcester
11/26/95 342 - GROUT BOND BEAM George on site for a conference. Special inspectors are supposed to be o
INSP - Masonry11/27/199511/27/199511/27/1995 FAIL
DetailsWes Worcester
/ / 342 - placed c/n after confering with Kent Johnson and George Slan be placed Fri (5 days) unless corrections completed. Told to get the f__ the site and not to come on site unless checking with "super" first. Cal George and we will
INSP - Foundation11/24/199511/24/199511/24/1995PPASS
DetailsWes Worcester
11/24/95 342 - retaining wall rebar cover ok, ck canted NW wall as plans
INSP - Footings11/21/199511/22/199511/22/1995ACANC
DetailsWes Worcester
11/22/95 342 - RETAINING WALL
INSP - Foundation11/17/199511/20/199511/20/1995PNR
DetailsWes Worcester
11/20/95 342 - 2 pm.arrived at 3:10 and still placing bar in bond beam a verts
INSP - Conference11/16/199511/16/199511/16/1995PNR
DetailsWes Worcester
11/16/95 342 - HE SAID YOU MISSED YESTERDAYS APPOINTMENT. HE IS SUPPOSE UP ONE FOR THIS PM.