INSP - Final | 9/30/1996 | 9/30/1996 | 9/30/1996 | | PASS |
|
|
|
|
INSP - Letter of compliance | | | 9/30/1996 | | PASS |
|
|
|
ISSUED #11905 C OF C BY MJW AS PER 301 THIS DATE.
|
INSP - Final | 8/28/1996 | 8/29/1996 | 8/29/1996 | A | PASS |
Jim Storey
|
|
|
08/28/96 301 - FNL -OK FINAL
|
INSP - Final | 8/22/1996 | 8/23/1996 | 8/23/1996 | P | NR |
Jim Storey
|
|
|
08/23/96 301 - CALL & REQUESTED THIS BE CANCELLED. WILL CALL TO RESCHEDU
|
INSP - Conference | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
|
|
|
reviewed fire code requirements for phase I completion, two signed and lighted exit ways w/ approved hardware required, new main ent/exit and reaer exit door. Side exits can wait for phase II. Discussed w/ carl in planning.
|
INSP - Conference | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | PASS |
Jim Sly
|
|
|
07/31/96 316 -
|
INSP - Framing/Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | PASS |
Jim Storey
|
|
|
07/08/96 301 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 5/20/1996 | 5/21/1996 | 5/21/1996 | A | NR |
Jim Storey
|
|
|
05/20/96 301 - CONF. REVEIWED REENGINEERING FOR RESOLVE PRIVOUS C/N OK.
|
INSP - Framing/Rough-in | 5/10/1996 | 5/10/1996 | 5/10/1996 | P | PART |
Jim Storey
|
|
|
05/10/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Foundation | 3/25/1996 | 3/26/1996 | 3/26/1996 | A | PASS |
|
|
|
AS EARLY AS POSSIBLE
|
INSP - Footings | 3/20/1996 | 3/21/1996 | 3/21/1996 | P | PASS |
|
|
|
will call
|
INSP - Foundation | 3/20/1996 | 3/21/1996 | 3/21/1996 | P | NR |
|
|
|
footing only. not ready for stem walls.
|
INSP - Foundation | 3/18/1996 | 3/18/1996 | 3/18/1996 | P | PASS |
|
|
|
Conference Only. Need Resubmittal on floor system.
|