INSP - Occupancy Sign-off | 10/17/1996 | 10/18/1996 | 10/18/1996 | A | PASS |
Joe Tawney
|
|
|
10/18/96 406 - sign off for perm occ
|
Permanent Occupancy | | 10/18/1996 | 10/18/1996 | | DONE |
|
|
|
|
INSP - Final | 9/25/1996 | 9/25/1996 | 9/25/1996 | | PASS |
|
|
|
OK FOR TEMP OCC REINSPECTION REQ
|
INSP - Framing/Rough-in | 8/15/1996 | 8/16/1996 | 8/16/1996 | A | PASS |
|
|
|
08/15/96 338 -
|
INSP - Framing/Rough-in | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | PART |
|
|
|
Reviewed suspended ceiling in corridors #1161 & 1166 lights require wires some misc. penetrations reguire firecaulk also reviewed and approved sheetrock ceiling cover in dietary room, walls @ mechanical room and corridor in this area are not completely firecaulked, will need to reinspect penetrations through ceiling access. 325.
|
INSP - Framing/Rough-in | 6/26/1996 | 6/27/1996 | 6/27/1996 | A | PASS |
|
|
|
06/26/96 338 - lead lining complete
|
INSP - Framing/Rough-in | 6/6/1996 | 6/6/1996 | 6/6/1996 | P | PART |
|
|
|
06/06/96 338 - partial penetration protection assemblies check
|
INSP - Framing/Rough-in | 5/22/1996 | 5/23/1996 | 5/23/1996 | A | PASS |
|
|
|
05/23/96 338 - AM. THURS. made ok ok to cover walls behind the elec plm need to inspect the firecaulk at the penetrations above the ceiling line before ceilings are installed.
|
INSP - Framing/Rough-in | 5/14/1996 | 5/15/1996 | 5/15/1996 | A | PART |
|
|
|
05/14/96 338 - partial made ok
|
INSP - Framing/Rough-in | 4/30/1996 | 5/1/1996 | 5/1/1996 | A | PART |
|
|
|
04/30/96 338 - partial ok to cover
|
INSP - Framing/Rough-in | 4/29/1996 | 4/30/1996 | 4/30/1996 | A | PART |
|
|
|
04/29/96 338 -
|
INSP - Framing/Rough-in | 3/20/1996 | 3/20/1996 | 3/20/1996 | P | PART |
|
|
|
03/20/96 338 - fire proofing inspN
|
INSP - Carpentry | 3/12/1996 | 3/12/1996 | 3/12/1996 | P | PASS |
|
|
|
03/12/96 338 - FIREPROOFING PAR T MADE K
|
INSP - Conference | 2/16/1996 | 2/16/1996 | 2/15/1996 | P | PASS |
|
|
|
02/16/96 338 - MIKE WILL CALL YOU FOR A TIME.
|
INSP - Flatwork | 2/7/1996 | 2/7/1996 | 2/7/1996 | P | PASS |
|
|
|
02/07/96 333 - slab FRMS-OK FORMS-REBAR
|
INSP - Roof | 1/26/1996 | 1/29/1996 | 1/29/1996 | A | PASS |
|
|
|
01/29/96 333 - framing of roof ok pending special inspection reports
|
INSP - Carpentry | 1/9/1996 | 1/10/1996 | 1/10/1996 | A | PASS |
|
|
|
01/09/96 333 - MTC ALREADY INSPECTED - FLOOR POUR (ROOF) POURING THURSDA FRMS-OK FORMS-REBAR for roof floor future expansion
|
INSP - Footings | 11/22/1995 | 11/22/1995 | 11/22/1995 | P | PART |
Carl Dependahl
|
|
|
11/22/95 340 - REBAR ALSO
|
INSP - Footings | 11/20/1995 | 11/21/1995 | 11/21/1995 | P | PASS |
|
|
|
11/21/95 333 - REBAR FTG -OK FOOTING
|
INSP - Carpentry | 11/20/1995 | 11/20/1995 | 11/20/1995 | P | PASS |
|
|
|
11/20/95 333 - rebar FTG -OK FOOTING grade beams
|
INSP - Foundation | 11/17/1995 | 11/17/1995 | 11/20/1995 | P | PASS |
|
|
|
11/17/95 333 - REBAR & CONCRETE FDN -OK FOUNDATION
|
INSP - Foundation | 11/16/1995 | 11/16/1995 | 11/16/1995 | P | PASS |
|
|
|
11/16/95 333 - FTG -OK FOOTING
|
INSP - Foundation | 11/1/1995 | 11/2/1995 | 11/2/1995 | A | PASS |
|
|
|
11/01/95 333 - FTG -OK FOOTING
|
INSP - Footings | 10/19/1995 | 10/19/1995 | 10/19/1995 | | PASS |
|
|
|
/ / 333 - FTG -OK FOOTING
|
INSP - Footings | 10/16/1995 | 10/17/1995 | 10/17/1995 | A | PART |
|
|
|
10/17/95 338 - REBAR THEY ARE USING SPECIAL INSPECTORS. POURED W/O INSP
|