Permanent Occupancy | | 12/11/1996 | 12/11/1996 | | DONE |
|
|
|
|
INSP - Permanent occupancy | 11/26/1996 | 11/26/1996 | 11/26/1996 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK FOR PERM OCC
|
INSP - Final | 11/20/1996 | 11/20/1996 | 11/20/1996 | | PASS |
|
|
|
OK FOR TEMP OCC FINAL SIGN OFF BY 11/22/96
|
INSP - Final | 11/15/1996 | 11/15/1996 | 11/15/1996 | | FAIL |
|
|
|
FAILED SPKLR PROBLEMS
|
INSP - Final | 11/4/1996 | 11/7/1996 | 11/7/1996 | P | NR |
Joe Tawney
|
|
|
11/07/96 406 - FINAL RESCH FOR 11/08/96 AT 8:00 AM
|
INSP - Final | 10/30/1996 | 10/31/1996 | 11/1/1996 | P | FAIL |
|
|
|
11/01/96 338 - not ready all penetrations of the corridor walls below t left open for inspection.
|
INSP - Final | 10/29/1996 | 10/29/1996 | 10/29/1996 | P | NR |
|
|
|
10/29/96 338 -
|
INSP-Sprinkler Rough-in/Hydro | 10/22/1996 | 10/22/1996 | 10/22/1996 | | PASS |
Joe Tawney
|
|
|
OK HYDRO TEST WP #1 WINGS B,C,& D
|
INSP-Sprinkler Rough-in/Hydro | 10/21/1996 | 10/21/1996 | 10/21/1996 | | FAIL |
|
|
|
hydro lost 7 psi in 2 hrs problems with hanger locations
|
INSP-Sprinkler Rough-in/Hydro | 10/16/1996 | 10/18/1996 | 10/18/1996 | A | PASS |
Joe Tawney
|
|
|
10/18/96 406 - TRENT BICE ###-#### OR OFF.###-#### OK HYDRO TEST FOR WPS WING A RESUBMITTAL OF SPKLR PLANS REQUIRED
|
INSP-Sprinkler Rough-in/Hydro | 9/24/1996 | 9/25/1996 | 9/25/1996 | P | NR |
Joe Tawney
|
|
|
ALAN - ###-####. NR WILL RESCHEDULE
|
INSP-Sprinkler Rough-in/Hydro | 9/24/1996 | 9/24/1996 | 9/23/1996 | P | FAIL |
Joe Tawney
|
|
|
AN FERGUSON - ###-####. FAIL BROKEN LINE
|
INSP - Ceiling grid | 8/21/1996 | 8/22/1996 | 8/22/1996 | A | PART |
|
|
|
08/22/96 338 -
|
INSP - Framing/Rough-in | 5/7/1996 | 5/8/1996 | 5/8/1996 | A | PART |
Jim Sly
|
|
|
05/07/96 316 - A.M. C/N All trades R.I. inspections...restrain lateral truss braces, wrap elect.box, draft stop expansion wall.
|
INSP - Carpentry | 5/1/1996 | 5/1/1996 | 5/1/1996 | | PART |
|
|
|
/ / 338 -
|
INSP - Conference | 5/1/1996 | 5/1/1996 | 5/1/1996 | | FAIL |
Jim Storey
|
|
|
/ / 301 - meeting w/eng.
|
INSP - Framing/Rough-in | 4/18/1996 | 4/18/1996 | 4/18/1996 | P | PART |
|
|
|
04/18/96 338 - PM
|
INSP - Framing/Rough-in | 4/12/1996 | 4/12/1996 | 4/11/1996 | A | FAIL |
|
|
|
see cn from perry
|
INSP - Wall cover | 4/10/1996 | 4/11/1996 | 4/11/1996 | A | FAIL |
|
|
|
04/10/96 338 - UPPER AREA not ready need to get ready and recall
|
INSP - Conference | 3/21/1996 | 3/21/1996 | 3/21/1996 | | PASS |
|
|
|
/ / 338 - called and talked to the super that there will be no inspect resubmitted plans are approved and new or amended plans are taken care o
|
INSP - Framing/Rough-in | 3/20/1996 | 3/21/1996 | 3/21/1996 | A | FAIL |
|
|
|
03/21/96 338 - ROOF FOR A WING no approved plans on the jobsite
|
INSP - Carpentry | 3/6/1996 | 3/7/1996 | 3/12/1996 | A | FAIL |
|
|
|
03/07/96 338 - ROOF NAILING
|
INSP - Wall cover | 2/27/1996 | 2/28/1996 | 2/28/1996 | A | PASS |
|
|
|
02/27/96 338 - NAILING INSPECTION. NOT READY
|
INSP - Footings | 11/6/1995 | 11/6/1995 | 11/6/1995 | P | FAIL |
Jim Storey
|
|
|
11/06/95 301 - POURING AT 10 AM TODAY.......
|
INSP - Footings | 11/6/1995 | 11/6/1995 | 11/6/1995 | | PASS |
|
|
|
/ / 333 - FTG -OK FOOTING
|