INSP - Final | 10/23/1996 | 10/23/1996 | 10/23/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL
|
Permanent Occupancy | | 10/23/1996 | 10/23/1996 | | DONE |
|
|
|
|
INSP - Final | 10/22/1996 | 10/22/1996 | 10/22/1996 | | PASS |
|
|
|
perm occ approved with completion of bld96-2187 sprinklers
|
INSP - Final | 9/12/1996 | 9/12/1996 | 9/13/1996 | P | PASS |
|
|
|
09/12/96 405 - HORIZON...DAN RAINER...KASTNER CONST inspected area, area covered under new sprinkler system
|
INSP - Final | 9/12/1996 | 9/12/1996 | 9/12/1996 | P | PASS |
Jim Storey
|
|
|
09/12/96 301 - HORIZON OP CTR...DAN RAINER...KASTNER CONST FNL -OK FINAL pending sign off on occ. card jds
|
INSP - Partial final | 2/26/1996 | 2/27/1996 | 2/27/1996 | A | PASS |
Jim Storey
|
|
|
temp o.c. ok pending temp landing, exterior sidding
|
INSP - Partial final | 2/22/1996 | 2/22/1996 | 2/23/1996 | P | FAIL |
Jim Storey
|
|
|
PARTIAL FINAL FOR TEMP.OCC. c/n penatrations,screw atchament at blow patch in separation,ada protection,seizmic pods in grid
|
INSP - Carpentry | 2/8/1996 | 2/8/1996 | 2/8/1996 | | PASS |
|
|
|
PASS - FIREWALL AT GRID 20A PER 12/A4-3.
|
INSP - Wall cover | 1/25/1996 | 1/25/1996 | 1/25/1996 | | PART |
Jim Storey
|
|
|
/ / 301 -
|
INSP - Carpentry | 1/19/1996 | 1/19/1996 | 1/19/1996 | | PART |
Jim Storey
|
|
|
/ / 301 -
|
INSP - Framing/Rough-in | 1/18/1996 | 1/19/1996 | 1/19/1996 | A | PART |
Jim Storey
|
|
|
01/18/96 301 -
|
INSP - Foundation | 11/30/1995 | 12/1/1995 | 12/4/1995 | A | CANC |
Jim Storey
|
|
|
12/01/95 301 - FND. REBAR
|
INSP - Footings | 11/29/1995 | 11/30/1995 | 12/4/1995 | A | CANC |
Jim Storey
|
|
|
11/29/95 301 -
|
INSP - Footings | 11/30/1995 | 11/30/1995 | 11/30/1995 | P | PASS |
Jim Storey
|
|
|
JIM - THIS WAS SENT TO CARL IN ERROR......A GLITCH?????? covered by special insp. report recieved ok at framing.
|
INSP - Foundation | 11/29/1995 | 11/30/1995 | 11/30/1995 | A | NR |
Carl Dependahl
|
|
|
11/30/95 340 -
|