Permit Information
Permit NumberBLD95-01036
StatusExpired
Name BOISE OB GYN
Site Address 5966 W CURTISIAN AVE
Project NameBOISE OB-GYN CLINIC
Customer Number 
ePlanReviewNo
Description
BOISE OB-GYN * TO ADD 1,000 SQ.FT. OF EXAM AND OFFICE AREA TO THE EXISTING MEDICAL OFFICE BUILDING. THE ADDITION WILL MEET THE REQUIREMENTS OF A TYPE V NONRATED, WOOD FRAMED, SINGLE STORY, RAISED FLOOR BUILDING. A FIRE SPRINKLER SYSTEM IS BEING INSTALLED THROUGH OUT THE BUILDING ALONG WITH A NEW EXIT DOOR IN THE SOUTH WALL OF THE EXISTING WAITING ROOM. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST AND THE 1991 EDITION OF THE UBC. MP (P.C.#95-431) DR 135-77/MOD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/21/19989/21/19989/21/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION
INSP - Final3/6/19973/7/19973/7/1997PNR
DetailsJoe Tawney
03/07/97 406 - NOT READY FOR REINSPECTION FDC & PIV LOCATION STILL NOT R
INSP - Final2/25/19972/25/19972/25/1997PFAIL
DetailsJoe Tawney
02/25/97 406 - REINSPECTION FOR FINAL FAILED PAINTING & LETTERING CURBS LOCATION OF FD CONN & PIV
INSP - Final2/5/19972/6/19972/6/1997AFAIL
DetailsJoe Tawney
FAIL STRIPING AND SIGNAGE FOR FD ACCESS PIV AND FDC NOT LOCATED AS SHOWN ON PLANS
INSP - Final2/3/19972/4/19972/4/1997ANR
Details
02/04/97 338 - no approved plans or paperwork on sith
INSP - Final2/4/19972/4/19972/4/1997 PART
FINAL ON SPKLR SYST ALARM TEST OK FLOW AND VALVE TAMPERS
INSP-Sprinkler Rough-in/Hydro1/9/19971/10/19971/10/1997APASS
DetailsJoe Tawney
RICK - ###-#### UNDERGROUND FLUSH OK
INSP - Framing/Rough-in7/8/19967/9/19967/9/1996APART
Details
07/09/96 338 - need fire block at the top and bottom plates ok to cover until re inspection
INSP - Framing/Rough-in6/12/19966/13/19966/13/1996APART
Details
06/13/96 333 - PARTIAL FRAME ceiling ok to cover ì
INSP - Foundation5/23/19965/23/19965/23/1996PPASS
Details
05/23/96 338 - PM r-bar placed ok to start pouring
INSP - Foundation5/23/19965/23/19965/23/1996 PASS
Details
/ / 338 - looks good FDN -OK FOUNDATION
INSP - Footings5/22/19965/22/19965/22/1996PPASS
Details
05/22/96 338 - pm....around 3 pm if possible..... FTG -OK FOOTING
INSP-Sprinkler Rough-in/Hydro1/15/19971/15/19971/15/1996PPASS
DetailsJoe Tawney
RICK - ###-#### OK ON UNDER GROUND HYDRO AND ABOVE GROUND HYDRO TESTS AND SPKLR ROUGH IN