ePlanReviewNo
Description
TO DEMOLISH AND REMOVE APPROXIMATELY 4800 SQ. FT. OF THE WEST END OF THE EXISTING LDS CHURCH AND TO CONSTRUCT AN APPROXIMATE 12885 SQ. FT., TWO STORY ADDITION AT THE WEST END OF THE CHURCH BUILDING. THIS ADDITION WILL INCLUDE OFFICE AREAS, MEETING ROOMS, RESTROOMS AND ENLARGING THE CULTURAL HALL INCLUDING A NEW PLATFORM AND STORAGE AREAS ON THE FIRST FLOOR. THE SECOND FLOOR ADDITION CONSISTS OF A 1020 SQ. FT. MECHANICAL ROOM. THE ADDITION WILL BE CONSTRUCTED OF MASONRY WALLS, WOOD FRAMED SECOND FLOOR AND ROOF SYSTEM AND CONCRETE SLAB FIRST FLOOR. THE TOTAL BUILDING AREA WITH NEW ADDITION IS 25,835 SQ. FT.. THIS PERMIT ALSO INCLUDES THE REMODEL AND UPDATE OF INTERIOR MATERIAL AT THE EXISTING PORTION OF THIS BUILDING PER THE DETAILS ON THE APPROVED PLANS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. JCM/421-95/CU-24-95
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 10/11/199610/11/1996 DONE
Details
INSP - Final10/4/199610/4/199610/4/1996 PASS
DetailsJoe Tawney
/ / 406 -
INSP - Final10/4/199610/4/199610/4/1996 PASS
DetailsJoe Tawney
/ / 406 -
INSP - Final10/2/199610/4/199610/3/1996APASS
Details
10/04/96 338 - made ok signed the perm side
INSP - Conference10/3/199610/3/199610/3/1996 PASS
Details
/ / 338 -
INSP - Final10/3/199610/3/199610/3/1996
INSP - Conference8/27/19968/27/19968/26/1996PPASS
Details
08/27/96 338 - 0out of time no access
INSP - Framing/Rough-in7/22/19967/23/19967/22/1996APASS
Details
07/23/96 338 - ALSO INSPEVTED BY THE ENGINEER OF RECORD
INSP - Framing/Rough-in7/16/19967/16/19967/16/1996PPASS
Details
07/16/96 338 - USING THERMAL FIBER TO FIRE BLOCK COMBUSTABLE FLOOR FURRI
INSP - Framing/Rough-in6/26/19966/26/19966/26/1996PPASS
Details
06/26/96 338 - P.M. west end ok to cover
INSP - Framing/Rough-in5/29/19965/30/19965/30/1996PPART
Details
05/30/96 338 - REINSPECTION partial made ok as other trades pass off
INSP - Masonry5/30/19965/30/19965/30/1996 PASS
Details
/ / 338 - last bond beam made ok r- bar placed
INSP - Masonry5/30/19965/30/19965/30/1996 PASS
Details
/ / 338 - last bond beam made ok r- bar placed
INSP - Footings5/22/19965/22/19965/22/1996 PASS
Details
/ / 338 - west end footings made ok r-bar placed
INSP - Framing/Rough-in5/21/19965/22/19965/22/1996APASS
Details
05/22/96 338 - Request for late a.m. inspection. partial frame ceilings
INSP - Set-back5/22/19965/22/19965/21/1996 CANC
Details
this was in error and cannot seem to delete item. Terry.
INSP - Framing/Rough-in5/7/19965/7/19965/7/1996 PART
Details
/ / 338 - STHG-OK ROOF SHEATHING FRAM-OK FRAMING PARTIAL
INSP - Conference5/1/19965/1/19965/1/1996PPASS
Details
05/01/96 338 -
INSP - Masonry4/29/19964/30/19964/30/1996APASS
Details
04/30/96 338 - INSPECTION FOR MASONARY REINFORCING typically poured w/o
INSP - Carpentry4/17/19964/18/19964/18/1996APASS
Details
04/18/96 338 - POURING AT 10 A.M.
INSP - Carpentry4/15/19964/16/19964/16/1996PFAIL
Details
04/15/96 338 - BOND BEAM POURED W/O INSP
INSP - Carpentry4/12/19964/15/19964/15/1996APASS
Details
04/12/96 338 - BOND BEAM BLOCK WALL
INSP - Carpentry4/11/19964/12/19964/12/1996APASS
Details
04/11/96 338 - poured w/o insp if typical of project will be ok
INSP - Carpentry4/11/19964/12/19964/12/1996PPASS
Details
04/12/96 338 - BOND BEAM. EARLY P.M. could not wait pwo insp
INSP - Carpentry4/10/19964/10/19964/10/1996PFAIL
Details
poured bond beam without inspection.
INSP - Masonry4/8/19964/9/19964/9/1996PPASS
Details
04/09/96 338 - pass r-bar placed
INSP - Carpentry4/5/19964/8/19964/8/1996PPASS
Details
04/08/96 338 - BOND BEAM, ETC..... misc re bar ok okk to pour this one
INSP - Carpentry4/5/19964/8/19964/8/1996APASS
Details
04/05/96 338 - BOND BEAM, ETC.
INSP - Carpentry4/4/19964/5/19964/5/1996PNR
Details
04/05/96 338 - BOND BEAM INSP. NOT READY TODAY
INSP - Masonry4/4/19964/4/19964/4/1996PPASS
Details
04/04/96 338 - MASN-REBAR OK
INSP - Masonry3/29/19964/1/19964/1/1996APASS
Details
made ok r-b ar placed
INSP - Foundation3/25/19963/26/19963/26/1996APASS
Details
03/26/96 338 - REBAR LATE A.M. 12 " footing made ok
INSP - Footings3/21/19963/22/19963/22/1996PPART
DetailsCarl Dependahl
03/22/96 340 - EARLY PM PLEASE BEFORE 3:00 r- bar placed ok to pour par
INSP - Conference3/8/19963/11/19963/19/1996APASS
Details
CONF. ON FRAMING DONE BY 333
INSP - Framing/Rough-in3/15/19963/18/19963/18/1996ACANC
Details
03/18/96 338 - done this am
INSP - Masonry3/13/19963/13/19963/13/1996PPASS
Details
03/13/96 338 - EARLY PM
INSP - Masonry3/12/19963/12/19963/12/1996PPASS
Details
03/12/96 338 - REINFORCING EARLY PM POSSIBLE. bond beam ok for the the elev at the gable looks good
INSP - Masonry3/11/19963/11/19963/11/1996APART
Details
/ / 333 - south and west wing 1st 4 feet of masonry and foundation at same
INSP - Masonry3/7/19963/8/19963/8/1996APART
DetailsWes Worcester
REBAR for masonry cells ok north wall on west side
INSP - Footings3/7/19963/7/19963/7/1996PPART
DetailsWes Worcester
rebar. WES - PLEASE CALL PERRY. THIS IS SCHEDULED FOR LATE P.M. South portion cover adjusted to minimum. North portion poured prior to my arrival on site. PWI
INSP - Footings3/1/19963/4/19963/4/1996APASS
Details
03/01/96 338 - partial
INSP - Foundation3/1/19963/4/19963/4/1996APASS
Details
03/01/96 338 - partial ok
INSP - Footings2/28/19962/29/19962/29/1996APASS
Details
REBAR LATE AM
INSP - Foundation2/23/19962/26/19962/26/1996APASS
Details
02/23/96 338 - WALL REINFORCING FDN -OK FOUNDATION
INSP - Foundation2/21/19962/22/19962/22/1996APASS
Details
02/21/96 338 - REBAR BETWEEN 11 & 12 A.M. PARTIAL FOOTING OK