Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD95-01548
StatusFinaled
Name COURTYARD BY MARRIOTT HOTEL
Site Address 222 S BROADWAY AVE
Project Name1
Customer Number 
ePlanReviewNo
Description
COURTYARD BY MARRIOTT HOTEL-BUILDING SECTION #1-THIS HOTEL BUILDING IS BEING DIVIDED INTO THREE BUILDINGS BY TWO AREA SEPARATION WALLS FOR ALLOWABLE AREA. PHASE I-TO POUR CONCRETE FOUNDATION AND SLAB FLOOR AND TO DO RELATED SITE IMPROVEMENTS ONLY. (SEE CONDITIONS FOR PHASE I CONSTRUCTION). PHASE II-TO CONSTRUCT A NEW 29375 SQ. FT., FOUR STORY, WOOD FRAME HOTEL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING CONTAINS THE INDOOR POOL/SPA ROOM, THE EXERCISE ROOM, GUEST LAUNDRY, 64 HOTEL GUEST ROOMS AND RELATED HOTEL STORAGE AREAS. THIS BUILDING IS FULLY FIRE SPRINKLED FOR ALLOWABLE ONE STORY HEIGHT INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. JCM/95-442/CU-21-95/DR-15-95
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/14/19971/14/1997 DONE
Details
INSP - Final1/14/1997 1/14/1997 PASS
INSP - Occupancy Sign-off1/13/19971/13/19971/13/1997 PASS
Insp - Art Yingling - Meets compliance w/CU-21-95/DR-15-95 - Final Occ. Signed - Approved to release Bond.
INSP - Occupancy Sign-off11/15/199611/15/199611/15/1996 FAIL
Issues of meeting DR cond. #1b, #1e (add'l shrubs and moving a tree). Providing specific approved shrubs. Cond. #1c - ground cover for NW Pad/pedestrian walkway, stiping drives and issue of Off-Premise Adv. Sign
INSP - Conference10/11/199610/11/199610/11/1996APASS
DetailsWes Worcester
installing hardware and caulking penetrations
INSP - Final10/11/199610/11/199610/11/1996 PASS
temp occ approved, c/n issued
INSP - Final10/11/199610/11/199610/11/1996APART
DetailsWes Worcester
INSP - Temporary occupancy10/10/199610/10/199610/10/1996 PASS
Insp for temp. by Art Y./Required bonding for landscaping & sprinkler system/Bond posted for $79,123.00 on 10/10/96 temporary occupancy signed.
INSP - Conference10/4/199610/4/199610/4/1996 PASS
Details
/ / 405 - advised on elevator shaft requirements
INSP - Conference10/4/199610/4/199610/4/1996 PASS
Details
/ / 405 - advised on elevator shaft requirements
INSP - Conference8/20/19968/20/19968/20/1996 PART
Details
/ / 405 - conference with Jim (supt) scheduled to temp final office ar reviewed list of issues critical to office occ
INSP - Fire Dept. Request8/20/19968/20/19968/20/1996 PASS
Details
/ / 405 - hydrant flush witnessed, ok
INSP - Carpentry8/13/19968/14/19968/14/1996PPART
DetailsWes Worcester
FIRE CAULK HALLWAY three floors each side corridors all ok area A still not done
INSP - Conference5/1/19965/1/19965/1/1996 PART
DetailsWes Worcester
/ / 342 -
INSP - Framing/Rough-in3/21/19963/21/19963/21/1996PNR
DetailsWes Worcester
partial r/i