Permanent Occupancy | | 3/14/1996 | 3/14/1996 | | DONE |
|
|
|
|
INSP - Final | 3/7/1996 | 3/7/1996 | 3/7/1996 | P | FAIL |
|
|
|
transfered from 338 for inspection health dept has not signed off as of yet cathy has the inspection card structural can sign-off when given the okay from cathy will notifiy perry dick
|
INSP - Final | 2/22/1996 | 2/23/1996 | 2/22/1996 | A | PART |
|
|
|
ok for temp occ
|
INSP - Ceiling grid | 2/1/1996 | 2/1/1996 | 2/1/1996 | P | PASS |
|
|
|
02/01/96 333 - SCLG-OK SUSPENDED CEILING
|
INSP - Conference | 1/22/1996 | 1/22/1996 | 1/22/1996 | | PASS |
|
|
|
/ / 333 - approved duct shafts
|
INSP - Conference | 1/22/1996 | 1/22/1996 | 1/22/1996 | | PASS |
|
|
|
/ / 333 - approved duct shafts
|
INSP - Carpentry | 1/18/1996 | 1/18/1996 | 1/18/1996 | P | PASS |
|
|
|
01/18/96 333 - DRAFT STOP ok ì
|
INSP - Carpentry | 1/11/1996 | 1/11/1996 | 1/11/1996 | P | PASS |
|
|
|
01/11/96 333 - FRAM-OK FRAMING shafts and shear wall
|
INSP - Carpentry | 1/10/1996 | 1/10/1996 | 1/10/1996 | P | PASS |
|
|
|
01/10/96 333 - FIRE CHASE approval of detail givento K-2
|
INSP - Framing/Rough-in | 1/9/1996 | 1/10/1996 | 1/10/1996 | A | PASS |
|
|
|
01/09/96 333 - FRAME REINSPECT FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 1/8/1996 | 1/9/1996 | 1/10/1996 | A | PART |
|
|
|
01/09/96 333 - shear walls ok to cover inside
|
INSP - Framing/Rough-in | 1/5/1996 | 1/8/1996 | 1/8/1996 | A | FAIL |
|
|
|
01/05/96 333 - OTH-OTHER AGENCIES NOT APPROVED submittals not recieved
|
INSP - Carpentry | 12/27/1995 | 12/28/1995 | 12/28/1995 | A | PART |
Carl Dependahl
|
|
|
12/28/95 340 - shear wall
|
INSP - Footings | 11/17/1995 | 11/20/1995 | 11/20/1995 | A | PASS |
|
|
|
|