- INSP SPRINKLER ROUGH-IN/HYDR | 10/15/1996 | 10/15/1996 | 10/15/1996 | | PART |
|
|
|
/ / 405 - compare as built plans to reality, to compare with approved add one head due to partition obstruction between telecom and store room rack storage over 12 ft used one place, two store rooms had material sta within 10" of head.
|
- INSP SPRINKLER ROUGH-IN/HYDR | 9/18/1996 | 9/18/1996 | 9/18/1996 | | PASS |
|
|
|
/ / 405 - eric - tv fp..hydro on existing building system..afvised nee and ug hydro, also advised on theneed for approved plans for final
|
INSP - Final | 8/21/1996 | 8/22/1996 | 8/22/1996 | P | PASS |
Jim Storey
|
|
|
08/22/96 301 - FNL -OK FINAL
|
Permanent Occupancy | | 8/22/1996 | 8/22/1996 | | DONE |
|
|
|
|
INSP - Final | 6/20/1996 | 6/20/1996 | 6/20/1996 | P | FAIL |
Jim Storey
|
|
|
06/20/96 301 - COF./TRUCK ENCLOSURE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 5/8/1996 | 5/9/1996 | 5/9/1996 | P | PASS |
Jim Storey
|
|
|
05/08/96 301 - TCO -TEMP C OF O ISSUED FOR 1,2,3 FLOORS. PENDING EMERG. POWER GEN. IN BLDG. EAST OF NEW STRUC. ELE.FIRE.STRUC TE
|
INSP - Final | 4/22/1996 | 4/22/1996 | 4/22/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL TCO -TEMP C OF
|
INSP - Conference | 4/4/1996 | 4/4/1996 | 4/4/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 -
|
INSP - Ceiling grid | 4/1/1996 | 4/1/1996 | 4/1/1996 | P | FAIL |
Jim Storey
|
|
|
04/01/96 301 -
|
INSP - Conference | 3/26/1996 | 3/26/1996 | 3/26/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 -
|
INSP - Ceiling grid | 2/21/1996 | 2/21/1996 | 2/21/1996 | P | CANC |
|
|
|
301 area.
|
INSP - Ceiling grid | 2/21/1996 | 2/21/1996 | 2/21/1996 | P | PASS |
Jim Storey
|
|
|
|