DR. SMITH'S DENTAL OFFICE * TO ADD 2387 SQ.FT WITH A 275 SQ.FT. BASEMENT, SINGLE STORY, WOOD FRAMED TYPE V NONRATED STRUCTURE TO THE EXISTING 923 SQ.FT. DENTAL OFFICE. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST, AND THE 1994 EDITION OF THE UBC. MP (PC#95-548) DR#67-95
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 6/18/19966/18/1996 DONE
Details
INSP - Final6/17/19966/18/19966/17/1996APASS
DetailsWes Worcester
06/17/96 342 - FINAL FOR C/O.
INSP - Framing/Rough-in5/16/19965/17/19965/11/1996PNR
DetailsWes Worcester
05/16/96 342 -
INSP - Carpentry5/10/19965/10/19965/4/1996PPASS
DetailsWes Worcester
05/10/96 342 - 2:30 APT nailing of shr wall ok
INSP - Conference5/4/19965/4/19965/4/1996 PASS
DetailsWes Worcester
/ / 342 - discussed 1 hr property wall and it is to be rocked continuo
INSP - Temporary occupancy4/25/19964/26/19964/20/1996ANR
DetailsWes Worcester
04/25/96 342 -
INSP - Conference4/20/19964/20/19964/20/1996 PART
DetailsWes Worcester
/ / 342 - handrails, guardrails, fire resistive const
INSP - Temporary occupancy4/24/19964/24/19964/19/1996PNR
DetailsWes Worcester
04/24/96 342 -
INSP - Conference4/19/19964/19/19964/19/1996 CANC
DetailsWes Worcester
/ / 342 - first thing Thurs AM
INSP - Conference4/19/19964/19/19964/19/1996 FAIL
DetailsWes Worcester
/ / 342 - first thing in am ...NO SHOW
INSP - Ceiling grid4/11/19964/11/19964/11/1996PPASS
Details
INSP - Framing/Rough-in3/11/19963/12/19963/12/1996APART
DetailsWes Worcester
upstairs only...cking on 1 hr ceiling and Oxygen storage rm 1 hr
INSP - Carpentry3/4/19963/5/19963/5/1996APART
DetailsWes Worcester
INSP - Footings2/27/19962/28/19962/28/1996APART
DetailsWes Worcester
RETAINING WALL REBAR special inspector on site
INSP - Wall cover2/21/19962/21/19962/21/1996PPASS
DetailsWes Worcester
nailing 1 hr wall South side ok
INSP - Foundation2/15/19962/15/19962/15/1996PPASS
DetailsWes Worcester
INSP - Foundation2/13/19962/14/19962/14/1996ANR
DetailsWes Worcester
INSP - Foundation2/5/19962/5/19962/5/1996PPASS
Details
02/05/96 338 - REBAR FDN -OK FOUNDATION
INSP - Foundation2/2/19962/5/19962/5/1996PPART
DetailsWes Worcester
INSP - Footings1/31/19961/31/19961/31/1996PPART
DetailsWes Worcester
front ftg
INSP - Foundation1/24/19961/24/19961/24/1996 PASS
DetailsWes Worcester
/ / 342 - moving stirrups on 2nd pier East wall, special inspector on
INSP - Foundation1/23/19961/24/19961/24/1996APASS
DetailsWes Worcester
01/24/96 342 - REBAR
INSP - Foundation1/17/19961/18/19961/20/1996ANR
DetailsWes Worcester
01/18/96 342 - REBAR
INSP - Footings1/11/19961/11/19961/19/1996PFAIL
DetailsJim Sly
75% Complete with re-bar Special Inspector to inspect befor pouring.
INSP - Footings1/17/19961/17/19961/17/1996 PASS
DetailsWes Worcester
/ / 342 -
INSP - Foundation1/17/19961/17/19961/17/1996PPART
DetailsWes Worcester
01/17/96 342 - fnd.rebar in dirt. corrected while on site, special insp
INSP - Footings1/16/19961/16/19961/16/1996PFAIL
DetailsWes Worcester
01/16/96 342 - rebar
INSP - Foundation1/11/19961/11/19961/11/1996 PART
DetailsWes Worcester
/ / 342 - special insp on site and will underpin adjacent bldg ftg and
INSP - Foundation1/10/19961/11/19961/11/1996ANR
DetailsWes Worcester
01/10/96 342 - REBAR special inspector to be on site
INSP - Footings1/3/19961/4/19961/4/1996APASS
DetailsWes Worcester
01/04/96 342 - rebar dowels had improper cover, breaking ties and adjust arrived on site. Note to resubmit change in rebar placement from #5 to
INSP - Foundation1/25/19961/26/19961/26/1995APART
DetailsWes Worcester
FND. REBAR, cautioned about over vibrating, pouring w/special insp on site