INSP - Final | 6/20/1996 | 6/21/1996 | 6/21/1996 | A | PART |
Wes Worcester
|
|
|
FRI. LATE A.M. TEMPORARY OK, FINAL OK, ELELVATOR OK
|
INSP - Final | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PART |
Wes Worcester
|
|
|
06/21/96 342 - FRI. LATE A.M.
|
Permanent Occupancy | | 6/21/1996 | 6/21/1996 | | DONE |
|
|
|
|
INSP - Final | 6/7/1996 | 6/7/1996 | 6/7/1996 | P | PART |
Wes Worcester
|
|
|
06/07/96 342 -
|
INSP - Final | 6/5/1996 | 6/5/1996 | 6/5/1996 | P | NR |
Wes Worcester
|
|
|
06/05/96 342 - THIS IS THE ONE YOU DID THIS A.M.
|
INSP - Final | 5/30/1996 | 5/30/1996 | 5/30/1996 | | NR |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Final | 6/4/1996 | 6/4/1996 | 5/29/1996 | P | NR |
Wes Worcester
|
|
|
06/04/96 342 - 3 P.M. APPOINTMENT
|
INSP - Final | 5/30/1996 | 5/31/1996 | 5/25/1996 | P | NR |
Wes Worcester
|
|
|
05/31/96 342 - FRI. P.M.
|
INSP - Ceiling grid | 5/24/1996 | 5/24/1996 | 5/18/1996 | P | NH |
Wes Worcester
|
|
|
05/24/96 342 -
|
INSP - Ceiling grid | 5/15/1996 | 5/16/1996 | 5/11/1996 | P | CANC |
Wes Worcester
|
|
|
05/15/96 342 - This is for a suspended ceiling inspection. Wes sick
|
INSP - Conference | 5/10/1996 | 5/10/1996 | 5/4/1996 | P | PASS |
Wes Worcester
|
|
|
05/10/96 342 - met w/architect and he is to advise contractor of fix for
|
INSP - Carpentry | 4/8/1996 | 4/9/1996 | 4/9/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Footings | 4/1/1996 | 4/2/1996 | 3/30/1996 | A | PASS |
Wes Worcester
|
|
|
04/02/96 342 - EARLY A.M. PLEASE partial in basement
|
INSP - Footings | 3/20/1996 | 3/21/1996 | 3/21/1996 | A | PART |
Wes Worcester
|
|
|
LATE AM PLEASE 1st 8' and adjoining ftg
|
INSP - Footings | 3/18/1996 | 3/19/1996 | 3/15/1996 | A | PASS |
Wes Worcester
|
|
|
03/18/96 342 - EARLY TUES.A.M. FLOOR FOOTING....ELEVATOR PIT...... rebar ok. retaining wall awaiting engineering.
|
INSP - Ceiling grid | 3/14/1996 | 3/15/1996 | 3/11/1996 | A | PART |
Wes Worcester
|
|
|
03/15/96 342 - only two rooms ready, will look at remainder next week
|
INSP - Framing/Rough-in | 3/7/1996 | 3/8/1996 | 3/8/1996 | P | PART |
Wes Worcester
|
|
|
Lindsey corridor and a portion of all others ok after plumb insp
|
INSP - Foundation | 2/26/1996 | 2/27/1996 | 2/27/1996 | P | NR |
Wes Worcester
|
|
|
LATE PM. FND. WALL not ready, ck back 02/28 at 1 pm. Note they have changed elevator ftgs. and grade beam brng.
|
INSP - Carpentry | 2/15/1996 | 2/16/1996 | 2/16/1996 | A | NR |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 1/31/1996 | 1/31/1996 | 1/31/1996 | P | PART |
Wes Worcester
|
|
|
outside corridor
|
INSP - Framing/Rough-in | 1/26/1996 | 1/26/1996 | 1/26/1996 | P | PART |
Wes Worcester
|
|
|
corridor wall ok, and has been changed since conference when it was noted that there was not a continous membrane at wall
|
INSP - Carpentry | 1/24/1996 | 1/24/1996 | 1/24/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - 1 hr wall is incorrect. Correcting
|
INSP - Flatwork | 1/24/1996 | 1/24/1996 | 1/24/1996 | P | CANC |
Wes Worcester
|
|
|
01/24/96 342 - no insp required
|
INSP - Foundation | 1/22/1996 | 1/23/1996 | 1/24/1996 | A | PASS |
Wes Worcester
|
|
|
01/23/96 342 - FND. STEM WALLS.
|
INSP - Footings | 1/19/1996 | 1/22/1996 | 1/22/1996 | A | PASS |
Wes Worcester
|
|
|
01/19/96 342 -
|