Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD95-01791
StatusFinaled
Name OVERLOOK CONDO'S
Site Address 5122 S SURPRISE WAY Unit: G.1
Project NameOVERLOOK
Customer Number 
ePlanReviewNo
Description
To build the NORTHWEST portion (5262 sf) of the two story structure containing one each of the living units A (1055sf) and D (1268sf) on the FIRST floor and one each of living units E (1758 sf) and B (1181 sf) on the SECOND floor, separated from the remaining structure by AREA SEPARATION WALLS, as per approved plans and attached requirement lists. (First Floor=2323 sf) (Second Floor=2939 sf with lofts). A separate Plumbing, Mechanical, and Electrical Permit must be purchased for this project. A letter of Compliance must be obtained before occupying this space. CU-45-95. ACHD #96-0497. Plan Check # 657-95. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final10/16/199710/17/199710/17/1997APASS
DetailsBob Archibald
Corrections made ok.
Permanent Occupancy 10/17/199710/17/1997 DONE
Details
INSP - Final9/25/19979/26/19979/26/1997PFAIL
DetailsBob Archibald
SAID BOB A GOING TO DO. Guardrails,handrails and glazing require correction.
INSP-Final Inspection9/24/19979/25/19979/25/1997PPASS
DetailsRick Jackson
inspected by 407
INSP - Energy code compliance9/4/19969/4/19969/4/1996PPASS
Details
unit 204
INSP - Energy code compliance9/4/19969/4/19969/4/1996PPASS
Details
unit 205
INSP - Energy code compliance9/4/19969/4/19969/4/1996PPASS
Details
unit 104
INSP - Energy code compliance9/4/19969/4/19969/4/1996PPASS
Details
unit 103
INSP - Energy code compliance9/4/19969/4/19969/4/1996PPASS
Details
UNIT 103-104-204-205
INSP - Framing/Rough-in8/30/19968/30/19968/30/1996 PASS
Details
/ / 400 -
INSP - Framing/Rough-in8/30/19968/30/19968/30/1996 PASS
Details
/ / 400 -
INSP - Framing/Rough-in8/29/19968/30/19968/30/1996APASS
Details
UNITS 103 - 104 - 204 - 205.
INSP - Framing/Rough-in8/30/19968/30/19968/30/1996 PASS
Details
/ / 400 - units 103 104 204 205
INSP - Framing/Rough-in8/30/19968/30/19968/30/1996 PASS
Details
/ / 400 -
INSP - Conference8/29/19968/29/19968/29/1996 PASS
Details
/ / 400 - confer with Krazan testing-req special insp scpoe of work ac
INSP - Framing/Rough-in9/5/19968/28/19968/28/1996AFAIL
Details
G-1 #204
INSP - Framing/Rough-in9/5/19968/28/19968/28/1996AFAIL
Details
G-1 unit #104
INSP - Framing/Rough-in9/5/19968/28/19968/28/1996AFAIL
Details
G-1 unit #205
INSP - Framing/Rough-in9/5/19968/28/19968/28/1996AFAIL
Details
G-1 unit #103
INSP - Energy code compliance7/23/19967/23/19967/23/1996PPASS
Details
07/23/96 333 - bath party wall and ceiling only FRAM-OK FRAMING INSL-OK INSULATION
INSP - Framing/Rough-in7/8/19967/8/19967/8/1996PFAIL
Details
07/08/96 333 - cn placed
INSP - Footings6/28/19967/1/19967/1/1996AFAIL
Details
07/01/96 333 - PUMP TRUCK AT 10:30 cn placed
INSP - Carpentry6/23/19966/23/19966/23/1996 PASS
Details
/ / 400 - walk thru with jim
INSP - Carpentry6/20/19966/20/19966/20/1996 PASS
Details
/ / 400 - walk thru with james unit G1
INSP - Carpentry6/20/19966/20/19966/20/1996 PASS
Details
/ / 400 - walk thru with james unit G1
INSP - Conference6/20/19966/20/19966/20/1996 PASS
Details
/ / 400 - pre-job confer with super & subs
INSP - Foundation5/28/19965/29/19965/29/1996PCANC
DetailsDave Lightfoot
05/28/96 337 - EARLY P.M.
INSP - Footings5/23/19965/24/19965/24/1996APASS
Details
05/23/96 400 - EARLY A.M. setbacks seem ok