INSP - Permanent occupancy | 7/31/1996 | 7/31/1996 | 7/16/1996 | | |
Marv Burrus
|
|
|
PERM OCC. CERT #6503 ISSUED TO COURTHOUSE INC.
|
INSP - Final | 7/16/1996 | 7/16/1996 | 7/16/1996 | | PASS |
|
|
|
/ / 338 - OCC REC CARD SIGNED BY 325 OK BY ME OTHER AGENCIES ARE APPRO
|
Permanent Occupancy | | 7/15/1996 | 7/15/1996 | | DONE |
|
|
|
|
INSP - Conference | 7/5/1996 | 7/8/1996 | 7/8/1996 | A | CANC |
Wes Worcester
|
|
|
CONF/W MECHANICAL CONTRACTOR AND THE MECH. INSPECTOR AT JOB SITE. TIME TO BE DETERMINED. Stuart handled w/Perry and I wasn't needed
|
INSP - Final | 7/1/1996 | 7/2/1996 | 7/2/1996 | P | PART |
|
|
|
07/03/96 338 - CALL DWIGHT BUTLIN - ###-####. EARLY P.M. HE CALLED & SA OTH-OTHER AGENCIES NOT APPROVED WILL BRING PROPER PAPERWORK DOWN TO BUIL DEPT FOR SIGNOFFS.
|
INSP - Wall cover | 4/2/1996 | 4/2/1996 | 4/2/1996 | P | PART |
|
|
|
SHEETROCK NAILING 2 hour walla in the concealed area between ceilings and floors above corridors.
|
INSP - Wall cover | 4/1/1996 | 3/29/1996 | 4/1/1996 | A | PART |
|
|
|
2 hour wall repair in the attic
|
INSP - Framing/Rough-in | 3/28/1996 | 3/28/1996 | 3/28/1996 | P | NR |
|
|
|
03/28/96 338 - RESCHEDULAD TIL TOMORROW
|
INSP - Framing/Rough-in | 3/26/1996 | 3/26/1996 | 3/26/1996 | P | PASS |
|
|
|
03/26/96 338 - CALL DWIGHT ###-####... partial ok to cover
|
INSP - Framing/Rough-in | 3/20/1996 | 3/21/1996 | 3/21/1996 | A | PART |
|
|
|
03/21/96 338 - drywall ok at the stair enclosures only
|