INSP - Letter of compliance | 4/22/1996 | 4/22/1996 | 4/22/1996 | A | PASS |
Wes Worcester
|
|
|
C/C ISSUED
|
INSP - Letter of compliance | 4/22/1996 | 4/22/1996 | 4/22/1996 | A | PASS |
Wes Worcester
|
|
|
C/C ISSUED
|
INSP - Final | 4/19/1996 | 4/22/1996 | 4/17/1996 | A | PASS |
Wes Worcester
|
|
|
04/22/96 342 -
|
INSP - Framing/Rough-in | 2/20/1996 | 2/20/1996 | 2/20/1996 | P | PART |
Wes Worcester
|
|
|
trusses not braced as per eng but as per Dennis Moody. Letter of Transmittal being sent requesting stamped engineering of "as built" fix
|
INSP - Energy code compliance | 2/13/1996 | 2/14/1996 | 2/14/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 2/13/1996 | 2/14/1996 | 2/14/1996 | A | FAIL |
Wes Worcester
|
|
|
reinspection fee assessed
|
INSP - Framing/Rough-in | 2/8/1996 | 2/9/1996 | 2/9/1996 | A | FAIL |
Wes Worcester
|
|
|
c/n issued @ ref truss eng, pt lds, pony walls (wet crawl).
|
INSP - Footings | 1/4/1996 | 1/5/1996 | 1/5/1996 | A | PASS |
Wes Worcester
|
|
|
01/04/96 342 -
|
INSP - Foundation | 1/5/1996 | 1/5/1996 | 1/5/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - poured but setbks ok
|