Permanent Occupancy | | 11/22/1996 | 11/22/1996 | | DONE |
|
|
|
|
INSP - Occupancy Sign-off | 11/12/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
|
|
|
11/13/96 338 - temp signed
|
INSP - Occupancy Sign-off | 11/12/1996 | 11/13/1996 | 11/13/1996 | A | PASS |
Joe Tawney
|
|
|
11/12/96 406 - OK FOR PERM OCC
|
INSP - Final | 10/24/1996 | 10/25/1996 | 10/25/1996 | A | PART |
|
|
|
10/25/96 338 - FOR C/O ok for the fish and wildlife only signed the te occ rec card copy for this area only
|
INSP - Final | 10/23/1996 | 10/24/1996 | 10/24/1996 | P | PASS |
Joe Tawney
|
|
|
10/24/96 406 - TIM WILCOMB - ###-#### 3RD FLR. FISH & WILDLIFE. OK FOR TEMP OCC
|
INSP - Partial final | 10/10/1996 | 10/11/1996 | 10/11/1996 | A | PASS |
|
|
|
10/10/96 338 - LATE A.M. FOR T/O. signeed the occ rec for the BLM only
|
INSP-Sprinkler Rough-in/Hydro | 10/9/1996 | 10/10/1996 | 10/10/1996 | A | PASS |
Joe Tawney
|
|
|
10/10/96 406 - JIM LAFOND - PAGER:###-####
|
INSP - Ceiling grid | 10/3/1996 | 10/7/1996 | 10/6/1996 | A | PASS |
|
|
|
10/08/96 338 - 3RD FLR. BLM ì
|
INSP - Ceiling grid | 9/25/1996 | 9/26/1996 | 9/24/1996 | A | PASS |
|
|
|
09/26/96 338 - accoustical ceiling - 1st flr.
|
INSP - Ceiling grid | 9/19/1996 | 9/19/1996 | 9/18/1996 | P | NR |
|
|
|
09/19/96 338 - REINSPECT CEILING ( correction issued ok to start cover o wire install on the slack wires)
|
INSP - Ceiling grid | 9/16/1996 | 9/16/1996 | 9/16/1996 | P | NR |
Carl Dependahl
|
|
|
09/16/96 340 - 1ST FLR. POURING AT 3 P.M. ???? NR
|
INSP - Ceiling grid | 9/16/1996 | 9/16/1996 | 9/16/1996 | | NH |
Jim Storey
|
|
|
/ / 301 -
|
INSP - Ceiling grid | 8/22/1996 | 8/23/1996 | 8/23/1996 | A | PASS |
Jim Sly
|
|
|
08/22/96 316 - 2nd floor...OK
|
INSP - Ceiling grid | 8/16/1996 | 8/19/1996 | 8/19/1996 | A | FAIL |
Jim Sly
|
|
|
/ / 316 - 2ND FLR. Fail.....Not complete.
|
INSP - Carpentry | 7/12/1996 | 7/15/1996 | 7/15/1996 | A | PASS |
|
|
|
07/15/96 338 - "THERMAL FIBER BATTS" ...... batts are installed in the 2-hr wall
|
INSP - Framing/Rough-in | 5/31/1996 | 5/31/1996 | 5/31/1996 | | PART |
|
|
|
/ / 338 - corridor tunnels and 2nd floor
|
INSP - Framing/Rough-in | 5/28/1996 | 5/29/1996 | 5/30/1996 | P | PART |
|
|
|
05/29/96 338 - PM WED ok to start hanging drywall on the 2nd floor
|
INSP - Framing/Rough-in | 5/28/1996 | 5/28/1996 | 5/28/1996 | P | NR |
Carl Dependahl
|
|
|
05/28/96 340 - NR, DISCUSSED W 338, HE'LL DO TOMORROW
|
INSP - Framing/Rough-in | 5/13/1996 | 5/13/1996 | 5/13/1996 | P | PART |
|
|
|
05/13/96 338 - partial made ok ist floor corridor ares
|
INSP - Framing/Rough-in | 5/7/1996 | 5/8/1996 | 5/8/1996 | A | PART |
Jim Sly
|
|
|
05/07/96 316 - AM OK to cover 1 side of corridor walls so framers can frame for corridor ceilings. jim sly
|