INSP - Letter of compliance | | | 5/29/1997 | | PASS |
|
|
|
Letter of Compliance #13509 issued 5-29-97 to Genther Masonry.
|
INSP - Final | 5/28/1997 | 5/28/1997 | 5/28/1997 | | PASS |
|
|
|
|
INSP - Final | 11/21/1996 | 11/22/1996 | 11/22/1996 | A | PASS |
Jim Storey
|
|
|
11/22/96 301 - whitnessed fire door actuwation ok
|
INSP - Temporary occupancy | 11/19/1996 | 11/22/1996 | 11/22/1996 | | PASS |
|
|
|
Art Y. insp. for Temp. Occ/- Must post bond for trash enclosure/prkg. lot striping & add H/C space/landscape in planter. (Approved Bond Amt. of $1,898.00) Bond posted 11/22/96 - Temporary Signed (DR-18-96)
|
INSP - Temporary occupancy | 11/22/1996 | 11/22/1996 | 11/22/1996 | | PART |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL pending sign off p.w. fire dept.
|
INSP - Carpentry | 11/12/1996 | 11/12/1996 | 11/12/1996 | P | PASS |
Jim Storey
|
|
|
11/12/96 301 - 2 HR. FIREWALL gyp ok pending s.i. fire proofing insp. ap
|
INSP - Framing/Rough-in | 10/4/1996 | 10/7/1996 | 10/7/1996 | A | NR |
Jim Storey
|
|
|
10/07/96 301 - OTH-OTHER AGENCIES NOT APPROVED plumbing.
|
INSP - Conference | 8/30/1996 | 8/30/1996 | 8/30/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - GWB -OK SHEETROCK NAILING to complet 2hr area wall west end.
|
INSP - Conference | 8/29/1996 | 8/29/1996 | 8/29/1996 | | PART |
Jim Storey
|
|
|
/ / 301 - resubmital required for aproval west end of 2hr wall.
|
INSP - Framing/Rough-in | 8/12/1996 | 8/12/1996 | 8/12/1996 | P | PASS |
Jim Storey
|
|
|
08/12/96 301 - FRAM-OK FRAMING of north load bearing wall.
|
INSP - Carpentry | 8/7/1996 | 8/7/1996 | 8/7/1996 | P | PASS |
Jim Sly
|
|
|
08/07/96 316 - FIREWALL INSP. Inspection of grout fill cmu around exist columns in 2hr area separation wall.
|
INSP - Framing/Rough-in | 8/5/1996 | 8/6/1996 | 8/6/1996 | A | PART |
Jim Sly
|
|
|
08/05/96 316 - Inspection of void area around steel columns at 2hr wall. fill with grout ..call for inspection while filling.
|
INSP - Ceiling grid | 7/24/1996 | 7/25/1996 | 7/25/1996 | A | PART |
Jim Storey
|
|
|
07/25/96 301 - trans to bob a. Not complete perimeter wires and spacer bars required, will check at final.
|
INSP - Framing/Rough-in | 6/20/1996 | 6/21/1996 | 6/21/1996 | A | FAIL |
Jim Sly
|
|
|
06/20/96 316 - Not ready...need detail for 10' section of tenant demisin
|
INSP - Framing/Rough-in | 6/12/1996 | 6/13/1996 | 6/13/1996 | P | PART |
Jim Sly
|
|
|
06/13/96 316 - Need plumb and mech. rough-in OK to cover N.and S. walls walls not containing plumbing...need to bring tenant demising wall back into compliance with Boise City.
|