Permanent Occupancy | | 12/17/1996 | 12/17/1996 | | DONE |
|
|
|
|
INSP - Final | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PASS |
Joe Tawney
|
|
|
12/02/96 406 - OK FOR PERM OCC FOR THE OPTICAL SHOPPE
|
INSP - Occupancy Sign-off | 11/14/1996 | 11/12/1996 | 11/12/1996 | | F |
|
|
|
Insp. by Art Yingling - meets compliance w/DR-117-95-Final Occ. signed.
|
INSP - Final | 11/7/1996 | 11/7/1996 | 11/7/1996 | A | PASS |
Joe Tawney
|
|
|
11/07/96 406 - GLEN HICKEY VP ###-#### OK FOR TEMP OCC
|
INSP - Final | 11/6/1996 | 11/6/1996 | 11/6/1996 | A | FAIL |
Joe Tawney
|
|
|
11/06/96 406 - GLEN HICKEY - VP-###-#### FAILED HARDWARE ON EXIT DOORS NOT CORRECT C/N WRITTEN
|
INSP - Final | 11/4/1996 | 11/5/1996 | 11/5/1996 | | FAIL |
|
|
|
FAIL HARDWARE ON DOORS NEEDS TO BE CHANGED ELECT NOT COMPLETE SOME EXIT DOORS DO NOT SWING OUT
|
INSP - Final | 11/1/1996 | 11/4/1996 | 11/4/1996 | A | PASS |
|
|
|
11/04/96 338 - not ready
|
INSP - Ceiling grid | 10/28/1996 | 10/29/1996 | 10/29/1996 | A | PASS |
|
|
|
10/29/96 338 - made ok
|
INSP - Framing/Rough-in | 10/1/1996 | 10/1/1996 | 9/30/1996 | P | PASS |
|
|
|
10/01/96 338 - made ok other agencies signed off
|
INSP - Framing/Rough-in | 9/26/1996 | 9/27/1996 | 9/26/1996 | P | PART |
|
|
|
09/27/96 338 - LATE PM made ok to cover with other trades blessing
|
INSP - Wall cover | 8/22/1996 | 8/22/1996 | 8/22/1996 | P | PART |
|
|
|
08/22/96 338 - need proper letter seals for acceptance
|
INSP - Conference | 8/14/1996 | 8/14/1996 | 8/14/1996 | A | PART |
Wes Worcester
|
|
|
talked to Perry @ covering
|
INSP - Carpentry | 8/12/1996 | 8/13/1996 | 8/13/1996 | A | FAIL |
Wes Worcester
|
|
|
covering.... called general to uncover and stop from covering
|
INSP - Conference | 8/13/1996 | 8/13/1996 | 8/13/1996 | P | FAIL |
Wes Worcester
|
|
|
talked to general again and referred to Perry
|
INSP - Footings | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
|
|
|
06/21/96 338 - R-BAR PLACED FDN -OK FOUNDATION
|
INSP - Conference | 6/20/1996 | 6/20/1996 | 6/20/1996 | | PASS |
|
|
|
/ / 338 - UPDATE WP
|
INSP - Foundation | 6/20/1996 | 6/20/1996 | 6/20/1996 | P | FAIL |
|
|
|
06/20/96 338 - LATE P.M. RECIEVED THE LETTER REQUESTED WORK NOT COMPLET REINSPECT 3:03 PM
|
INSP - Foundation | 6/17/1996 | 6/18/1996 | 6/18/1996 | P | FAIL |
|
|
|
06/18/96 338 - TUESDAY...P.M. (EARLY) not ready c/n in force must pass poured w/o same. forms not complete r-bar clearence dirty concrete etc
|
INSP - Final | 11/6/1996 | 11/7/1996 | 1/3/1980 | P | PART |
|
|
|
11/08/96 338 - temp occ made ok signed the temp col still need achd pw
|