Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD96-00490
StatusFinaled
Name BOISE CITY CLERK'S ARCHIVE FAC
Site Address 3641 W OVERLAND RD
Project Name 
Customer Number 
ePlanReviewNo
Description
**BOISE CITY CLERK'S ARCHIVE FACILITY** Fire sprinklers used for building area increase. To create and remodel a 10,311 square foot two story tenant space (1,085 sq.ft. basement, 4,794 sq.ft. 1st floor, 4,432 sq.ft. 2nd floor) for use as a records retention facility. Work is to include 1-hr fire-resistive tenant demising walls, a restroom accessible to the disabled, 2 new stairways, new/modified footings, upgrades to floor systems, interior nonbearing walls, enlarged door openings in existing concrete walls, and a wall infill in the East wall all per approved drawings, engineering, and plancheck notes on file. Separate electrical, plumbing, and mechanical permits are required. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. PC-144-96A **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/28/19968/28/1996 DONE
Details
INSP - Final8/22/19968/26/19968/26/1996APASS
DetailsJim Storey
08/26/96 301 - FNL -OK FINAL
INSP - Conference8/19/19968/19/19968/19/1996 FAIL
DetailsJim Storey
/ / 301 - c/n stil in efect on stair tread length min 11 inches.
INSP - Final8/16/19968/16/19968/16/1996PPART
DetailsJim Storey
08/16/96 301 - 1:30 FRI. P.M. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED TCO -TEMP C OF O ISSUED
INSP - Conference7/11/19967/11/19967/11/1996 PART
DetailsJim Sly
/ / 316 - City archives..(Don Hackey) received OK to move archives to floor only...Told contractor to have Don call me in order to verify who gave the OK for the move.
INSP - Conference6/25/19966/25/19966/25/1996 PASS
DetailsJim Sly
/ / 316 - Met with Ken..superintendant to discuss new calculations for existing column footings....needs no reinforcement. Copy of calcs in approved set at city...1 to contractor.
INSP - Conference6/21/19966/21/19966/21/1996 PASS
DetailsJim Sly
/ / 316 - Dropped off letter of transmittal for 2nd resubmittal of foo detail...to include engineering calcs and stamp.
INSP - Framing/Rough-in6/18/19966/19/19966/19/1996PPASS
DetailsJim Sly
06/18/96 316 - OK..Need engineering for footings before pour...walls etc for cover.
INSP - Framing/Rough-in6/10/19966/10/19966/10/1996PFAIL
DetailsJim Sly
06/10/96 316 - Met with Ken...job superintendant... went over plan check and walk thru for framing corrections.... not ready for full framing inspection.