INSP - Miscellaneous | 10/15/1997 | 4/15/1998 | 4/15/1998 | A | NR |
|
|
|
04/15/98 338 - stil in progress getting monthly supports from the proper CONSTRUCTION IS NO STARTED, VOID PERMIT AS PER PERRY PAINE.MPS
|
INSP - Expired/Cancelled | 12/5/1997 | 12/9/1997 | 12/9/1997 | P | PASS |
|
|
|
12/09/97 338 - here is that inspection. I have voided the permit thanks
|
INSP - Miscellaneous | 10/15/1997 | 10/15/1997 | 10/15/1997 | P | PART |
|
|
|
confirmation that construction has stopped..request update 180 days from this date to verify yes or no on the revocation of permit per ubc abandoned work
|
INSP - Miscellaneous | 9/15/1997 | 9/15/1997 | 9/15/1997 | | PASS |
|
|
|
c/n issued to General Contractor stating 106.4.4 expiration of permit due to project shut down work not resumed within 180 days will constitute city athourity to cancell permit.
|
INSP - Masonry | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | PASS |
|
|
|
08/08/97 338 - made ok with sp insp approval
|
INSP - Footings | 7/29/1997 | 7/29/1997 | 7/29/1997 | P | PASS |
|
|
|
07/29/97 338 - MADE OKor footing 2:30 spec. inspector on site FTG -OK FOOTING INTERRIOR
|
INSP - Foundation | 7/28/1997 | 7/29/1997 | 7/28/1997 | A | PASS |
|
|
|
07/29/97 338 - POURING 2:30 SPECIAL INSPECTOR ON SITE made ok with sp in
|
INSP - Masonry | 7/24/1997 | 7/25/1997 | 7/25/1997 | A | CANC |
Tom Arcoraci
|
|
|
pouring stem walls
|
INSP - Footings | 7/24/1997 | 7/24/1997 | 7/24/1997 | P | PART |
Tom Arcoraci
|
|
|
POURING AROUND 2:30 TO 3 SPECIAL INSPECTOR ON SITE MTI
|
INSP - Footings | 7/22/1997 | 7/22/1997 | 7/22/1997 | P | part |
Tom Arcoraci
|
|
|
07/22/97 408 - special inspector on site pouring at 1 o'clock
|
INSP - Footings | 7/17/1997 | 7/17/1997 | 7/17/1997 | P | PASS |
|
|
|
07/17/97 338 - made ok with sp insp ok
|
INSP - Foundation | 7/15/1997 | 7/16/1997 | 7/16/1997 | P | PASS |
|
|
|
07/16/97 333 - pending special insp reports
|
INSP - Foundation | 7/10/1997 | 7/11/1997 | 7/11/1997 | A | PART |
Tom Arcoraci
|
|
|
STEM WALL, HAS A SPECIAL INSPECTOR ON SITE.
|
INSP - Foundation | 7/10/1997 | 7/10/1997 | 7/10/1997 | P | PASS |
|
|
|
07/10/97 338 - PUMPING GROUT made ok with sp insp approval MASN-REBAR OK
|
INSP - Footings | 7/2/1997 | 7/3/1997 | 7/3/1997 | A | PASS |
|
|
|
07/03/97 338 - READY AT 11 THEY HAVE SPECIAL INSPECTOR made ok with sp i
|
INSP - Conference | 6/30/1997 | 6/30/1997 | 6/30/1997 | | PASS |
|
|
|
/ / 338 - conference on the inspections to be requested for this proje concrete sp insp or not as to have a correlation of inspection requests special inspections done
|
INSP - Footings | 6/27/1997 | 6/30/1997 | 6/30/1997 | A | PART |
|
|
|
06/30/97 338 - Dennis Cherry ###-#### c/n issued ok to pour with the sp
|